Laserfiche WebLink
MR4 PRESERVATION OF NATURAL DRAINAGE SYSTEMS AND <br /> OUTFALLS AND PROVISION OF OFF-SITE MITIGATION <br /> Does not apply to the existing developed site. <br /> MR5 ONSITE STORMWATER AND SOIL MANAGEMENT <br /> Does not apply to the existing developed site. <br /> MR6 TREATMENT FACILITY <br /> Does not apply to the existing developed site. <br /> DESIGN AND MAINTENANCE <br /> Stormwater discharge from NPGS. <br /> Site will direct runoff to the existing detention facility. <br /> MR7, FLOW CONTROL <br /> Site will direct runoff to the existing detention facility. <br /> MR8, DETENTION <br /> Does not apply to the water main extension. Site will direct runoff to the existing <br /> detention facility. <br /> MR9, INSPECTION <br /> Provided by the City of Everett. <br /> Operation and Maintenance requirements. <br /> Provided by the Northshore Christian Church. <br /> VIII. Construction Phasing <br /> 1. Sequence is install erosion control measures. <br /> 2. Install utilities <br /> 3. Construct building facility <br /> 4. Re grade disturbed areas as required. <br /> 5. Seed and/or hydroseed <br />