Laserfiche WebLink
k ` , <br /> IX. Construction Schedule <br /> 1. Attend pre-construction conference. Certified erosion and sediment control <br /> specialist to attend. <br /> 2. Install T.E.S.C. measures. <br /> 3. Install utilities and construct building. <br /> 4. As-built. <br /> 5. Remove erosion control measures. <br /> X. Financial/Ownership Responsibilities <br /> 1. Northshore Christian Church is responsible for all bonds, etc. <br /> 2. Northshore Christian Church or construction represenitive is responsible for <br /> construction related questions. <br /> XI. Engineering Calculations <br /> None provided for the construction. <br />