My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5700 23RD DR W 2018-06-28
>
Address Records
>
23RD DR W
>
5700
>
5700 23RD DR W 2018-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 8:47:07 AM
Creation date
6/28/2018 8:46:35 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5700
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northshore Christian Acader13 I avilion II Trip GeilLlllllon& Mitigation Analysis <br /> Mitigation <br /> The City of Everett has established a southwest subarea traffic mitigation fee of$1,006.00 per new <br /> PM peak-hour trip generated by developments. The trip generation in this report shows that the <br /> proposed 15,062 SF of private school will generate 11.2 new PM peak-hour trips based on ITE. <br /> Therefore, the Northshore Christian Academy Pavilion II will have a total mitigation fee to the City <br /> of Everett of$11,267.20. <br /> Attachments (A-1 to A-5) <br /> Gibson Traffic Consultants, Inc. January 2017 <br /> info@gibsontraffic.com r' GTC #16-270 <br /> (2(1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.