My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
615 80TH ST SW 2022-01-03
>
Address Records
>
80TH ST SW
>
615
>
615 80TH ST SW 2022-01-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 3:30:11 PM
Creation date
6/28/2018 10:26:31 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
615
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />Building Permit Plans Checklist, •• <br />2012 Washington State Energy Code Compliance Forms for Commercial Buildings Including R2 & R3 over 3 stories and all R1 <br />Project: Title: POCOCKFACING SHELL ADDITION <br />Date <br />Applicability <br />Code <br />Location in <br />Building <br />(yes,no,na) <br />Section <br />Component <br />Compliance information required in permit documents <br />Documents <br />Department Notes <br />in single story buildings, provide list of enclosed areas that exceed 2,500 sf, <br />have ceiling height greater than 15 ft, and are space types required to <br />comply with this provision. For each area identify space type, floor area, <br />floor to ceiling height, and any exception taken; <br />Spaces in single <br />For each area provide calculations for percentage of conditioned floor area <br />na <br />C402.4.2 <br />story buildings <br />located within a daylight zone including skylight and eligible sidelight <br />requiring skylights <br />daylight zones; <br />For each area provide calculations for percentage of skylight area, OR; <br />Provide calculations for skylight effective aperture (Equation C4-5); <br />Indicate haze factor of skylight glazing material or diffuser <br />AIR LEAKAGE <br />Air barrier <br />Indicate location of continuous air barrier on plans and sections; <br />Provide details for all joints, transitions in materials, penetrations in air <br />barrier and note method of sealing (caulked, gasketed, or other approved <br />ye <br />C402.5.1.1 <br />construction and <br />sealing <br />method) <br />Rooms containing <br />Indicate that room(s) containing non -direct vent appliances is isolated from <br />open combustion fuel <br />inside the thermal envelope with a sealed air barrier, including doorway <br />C402.5.3 <br />burning appliances <br />gasketing and sealing around ductwork and piping penetrations; <br />used for space <br />conditioning <br />Indicate insulation provided in wall, floor and ceiling of the room envelope, <br />and insulation required on combustion air ductwork <br />Access openings and <br />Indicate locations of all access openings and doors to shafts, chutes, <br />na <br />C40Z5,4 <br />doors to shafts, <br />Chutes, stairways and <br />doors <br />stairways and elevators; <br />Indicate method of gasketing, weatherstripping and sealing of these <br />openings <br />indicate locations of all stairway enclosure, elevator shaft and building <br />na <br />C402.5.5 <br />C403.2.4.3 <br />Outdoor air intakes, <br />exhausts and relief <br />pressurization relief openings, outside air intakes and exhaust openings; <br />Note in envelope plans that all relief, outside air intake and exhaust <br />openings <br />openings shall be provided with dampers in accordance with Mechanical <br />Section C403.2.4.3 <br />Indicate method of sealing between light fixture housing and wall or ceiling; <br />.,a <br />C402.5.6 <br />Recessed lighting in <br />building envelope <br />Note in envelope plans that all recessed lighting fixtures shall be IC rated <br />and have an air leakage rating not greater than 2 cfm per A5TM E283 test; <br />Include these requirements in lighting fixture schedules <br />na <br />C402.5.6 <br />Loading dock seals <br />Indicate weather seal at cargo and loading dock doors <br />Indicate locations and dimensions of vestibules and air curtains; <br />Indicate exception and criteria utilized for all building entrances and exits <br />DA <br />C402.5.7 <br />Vestibules <br />that do not have_a vestibule or air curtain; <br />Indicate required performance for air curtains Installed per exception 7; _ <br />For unconditioned vestibules, indicate which envelope assembly (interior or <br />exterior) complies with the requirements for a conditioned space <br />Indicate on plans the air barrier boundaries and area calculations on all six <br />sides of the air barrier; <br />_ <br />Indicate air barrier test method in accordance with ASTM E779or approved <br />equivalent; <br />Indicate required maximum leakage rate for compliance. <br />- <br />C103.2 <br />C402.5.1.2 <br />Building air leakage <br />test <br />Include the following requirements in project documents: (1) Submit air <br />barrier test report to jurisdiction once test is completed; (2) If test results <br />exceed 0.4 cfm/ft2 at 0,3 in. wg, then visually inspect air barrier and seal <br />noted sources of leakage; (3) Submit a follow-up report to jurisdiction noting <br />corrective measures taken; (4) include air barrier test report in compliance <br />documentation provided to owner. <br />n nv .l .7W9VVtWU wI <br />End of Building Permit Plans Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.