Laserfiche WebLink
1 <br />�.. �....., o..,,.,.... n..,�e n......a:e....e e...me #-r Rnmmnreint R Idinne Inelne inn R27 R3. R4 over 3 stories and all R1 Revised August 2016 <br />Project Title: pocock racing shells <br />JDate 3/25/2017 <br />Interior Lighting System <br />6 lamp high bay industrial fluorescent fixture T8 <br />Description <br />2 lamp industrial fluorescent fixture T8 <br />Interior Lighting Power <br />O Building Area Method ❑ Space -by -space Method <br />Allowance Method <br />select method used in project, <br />Interior Lighting Controls <br />❑ All C405.2.1- C405.2.8 Controls ❑ C405.2 Exception 5 Luminaire Level <br />Lighting Control (LLLC) <br />❑ Additional Efficiency Package Option <br />C406.4 Enhanced digital lighting controls <br />To comply with C406.4, no less than 90% of the total installed Interior fighting power shall comply with the <br />required controls per C406.4. <br />Dwelling Unit Interior <br />Permanently installed Interior lighting fixtures in dwelling units comply with: O <br />Lighting <br />O C405.2 thru C405.5 Commercial Lighting Controls and LPA <br />O C406.3 High Efficacy Lighting <br />O <br />Exterior Lighting System <br />LED wall pack dark sky rated <br />Description <br />