Laserfiche WebLink
Step 1: Fill in the Quantities below: <br />The total amount of proposed hard surfaces (rooftop, pavement, etc.) for my project site is: 10,800 S.F. (Box 1) <br />6,180 <br />The amount of existin hard surfaces on my project site that will be removed or replaced is: S.F. (Box 2) <br />The amount of net new hard surfaces on my site (proposed minus existing to be removed/replaced) is: 4,620 S.F. (Box 3) <br />Step 2: Evaluate the three statements below by selecting TRUE or FALSE: <br />1. The value of Box 2 + Box 3 = Box 1, above. <br />ANSWER: Choose an item. TOE, <br />*If False, re-evaluate your areas and try again. <br />2. The value in Box 1 above is 2,000 square feet or more. <br />ANSWER: Choose an item. -"F— <br />*lf False, only complete General information & Construction Storm water Plan. <br />3. The value in Box 3 above is less than 5,000 square feet. <br />ANSWER: Choose an item.1vilti <br />*lf False, submit an Engineered Drainage Report addressing MR# 1-9. <br />I Reserved for City of Everett Public Works Approval Stamp I <br />PUBLIC WQRKS DEPARTMENT <br />BY -Zai Id ld L'A —AMAh <br />DATE 2-2- 013- <br />CITY OF EVERETT REVIEWED FOR PERMIT <br />PW 16ia -C)qq <br />Step 3: Proceed with this entire Questionnaire if all 3 answers above are TRUE. <br />General Information: <br />Project Site Address: 615 801h St. SW, Everett, WA <br />Prepared By: Ned Nelson, Architect <br />Date Prepared:12-28-2016 <br />Existing Site Information: <br />1. Please describe the existing structures, hard surfaces, slopes, drainage patterns, drainage <br />pipes, vegetation, etc. <br />Two existing one story buildings for manufacture of rowing shells, and storage for related <br />materials and parts. The developed site is relatively flat. Paving and compacted gravel are <br />the parking and storage area surfaces. There is an approximate 20 ft. wide treed/vegetated <br />bank on the entire west border and a 45 ft. wide treed/vegetated bank on the entire east <br />border, sloping down to Hardeson Rd. An existing tightline catch basin system connects to <br />the storm line in Hardeson Rd. The project improvments include a building addition. Runoff <br />from the roof area will be collected in downspouts and tight lined to an existing private <br />storm drainage system. The existing storm drainage system will be un-altered with the <br />exception of the new roof leader connection. Runoff from the site discharges to the public <br />storm drainage system in Hardeson Rd. via 8" PVC pipe. <br />2. Please provide the following quantities of existing hard surfaces in square feet: <br />Existing Roof Area:17,920 sf <br />Page 1 of 7, <br />C1.'.}70FEVE _RE 1 1 32L.z,=C`.:Li-0c=irSt re,et. I a`€ ret't, ev'z''1982f)1 1 4,23-21K 7,88110 le, ,`e <br />