Laserfiche WebLink
FINS DECLARATION OF NON-SIGNIF�NCE <br />SEPA # 35-83 <br />per ne ordinance in effect at the time and according to the <br />information provided on the approved plans on the date of permit <br />issuance. <br />9. Land alteration activities must comply with Section 2 of the City <br />Design and Construction Standards: for erosion control measures, see <br />especially Sections 2.1.2. and 2.1.3. <br />10. A fire hydrant is required within 200 driving feet, but not closer than <br />50 feet, of every structure. <br />11. During construction, all truck traffic to and from the site <br />City of Everett shall be on arterial streets unless otherwise <br />the <br />-� approved <br />by the Public Works Department. City streets and alleys are to be kept <br />clear of dirt and debris at all times during construction. Dust <br />suppression and street cleaning must occur as directed by the Public <br />Works Inspector. <br />INFORMATION FOR DEVELOPER: <br />1. Performance guarantees are required for landscaping. <br />2. An one year guarantee is required on the site landscapingfor an amount <br />not leas than t01 of the cost of installation and shall run for one <br />snj <br />year from the date of the first Occupancy Permit for the project. <br />PROPONENT: LOCATI011: <br />r.' Lord Electric Co. Inc. Northwest corner of 1lardeson <br />2222 - 37th Road and 80th Street <br />Everett, WA. 98201. <br />s. <br />a. <br />3; <br />Lead Agency► : City of Everett Manning Department Receipt <br />Conntact Persorn Bob Landles Phone: 2594731 File No. <br />This Proposal has. been determined not to have a significant adverse impact on the environment. <br />� <br />An Environmental Impact Statement is not required under RCW 43.21C.030(2Hc). This decision _ <br />was made after review by the lead agency of a completed environmental checklist and other <br />r information on file with the lead agency. This Declaration of Non -Significance is specifically <br />conditioned on compliance with the conditions attached hereto which are incorporated by reference <br />+' as if fully set forth herein. <br />A fifteen day review period has elapsed for this project and no adverse comments were received. <br />_Responsible Official: Dennis Derickson <br />Title: <br />Manning Director <br />Dam <br />October I8, 1983 <br />Signature: <br />NOTE:: This final Declaration of Non -Significance may be withdrawn in the event of si ficant <br />ohangm f in 'dun proposal, or failure to comply with the conditions upon which this Declaration <br />gnficance is predicated. <br />.i <br />