My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 787-81
>
Ordinances
>
Ordinance 787-81
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 11:29:47 AM
Creation date
6/28/2018 11:29:46 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
787-81
Date
5/27/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 2 . Construct curb, gutter, and sidewalk on both sides <br /> of the 1200 block of Maple (estimated project cost : <br /> $51 , 000) . <br /> 3 . Continue youth recreation program (project cost: <br /> $12 , 000) . <br /> 4 . $1, 000 to the Council for a Greater Everett for <br /> neighborhood fair share assistance for support ser- <br /> vices to Northeast Everett Neighborhood Organization. <br /> 5 . Construct a sidewalk on the south side of Highway 99 <br /> from 7th Street to Walnut (estimated project cost: <br /> $7 , 600) . <br /> 6 . Overlay roadbed on 5th Street from Pilchuck Path to <br /> Walnut Street (estimated project cost: $6 ,325) . <br /> 7 . Construct curb, gutter, and sidewalk on the northwest <br /> corner of 19th Street and Pine Street intersection <br /> (estimated project cost: $1, 900) . <br /> C. Riverside Neighborhood Improvements <br /> 1. Replace sections of sidewalk on Highland between 23rd <br /> and Everett Avenue. The following segments are sug- <br /> gested (estimated project cost: $8 ,600) . <br /> a. Highland between 23rd and 24th (east side) . <br /> (1) 8 ' sidewalk replaced in front of 2301 Highland <br /> (2) 184 ' sidewalk replaced in front of 2305 High- <br /> land extending through 2311 and 2317 Highland <br /> (3) 58 ' sidewalk replaced in front of 2329 Highland <br /> b. Highland between 24th and 25th (east side) . <br /> (1) 60 ' sidewalk replaced in front of 2423 Highland <br /> (2) 50 ' sidewalk replaced in front of 2427 Highland <br /> (3) 225 ' sidewalk replaced south of 2427 to freeway <br /> fence <br /> c. Highland between 23rd and 24th (west side) . <br /> (1) 85 ' sidewalk replaced in front of 2306 Highland <br /> including vacant area at corner; rest of block ok <br /> d. Highland between 25th and 26th (west side) . <br /> (1) 260 ' sidewalk replaced in front of house by free- <br /> way (no number) . Curbs may be needed. <br /> 2 . Install concrete curb and gutter and off-street parking <br /> on 24th Street from Walnut to State Street as outlined <br /> in the Garfield Park Master Plan (estimated project <br /> cost: $27 , 800) . <br /> 3 . Replace broken sidewalk as needed on the east side of <br /> Walnut from 20th to 22nd Street (estimated project cost: <br /> $5 , 000) . <br /> 4 . Replace approximately 165 feet of sidewalk and construct <br /> a drainage system to intercept ground water flow on the <br /> west side of Maple from 19th Street to Victor Place <br /> (estimated project cost : $4 , 700) . <br /> (2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.