My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 787-81
>
Ordinances
>
Ordinance 787-81
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 11:29:47 AM
Creation date
6/28/2018 11:29:46 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
787-81
Date
5/27/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Allocate funds to the Council for a Greater Everett to <br /> provide support services to the Riverside Neighborhood <br /> (funds to be allocated: $1 , 000) <br /> 6 . Replace sidewalk segment in front of 2401 and 2405 <br /> Virginia (estimated project cost: $1 , 100) . <br /> 7 . Replace sidewalk segment in front of 2414 Baker (esti- <br /> mated project cost: $550) . <br /> 8 . Replace sidewalk segment in front of 2524 Maple (esti- <br /> mated project cost: $900) . <br /> D. Port Gardner Neighborhood Improvements <br /> 1. $1, 000 to Council for Greater Everett for neighborhood <br /> fair share assistance for support services to Port <br /> Gardner neighborhood. <br /> 2 . Terrace Drive (43rd Street to 44th Street) , concrete <br /> curb and gutter on both sides , install storm drainage <br /> system, landscaping behind curb, asphalt resurfacing <br /> (estimated project cost: $42 ,500) . <br /> 3. 43rd Street (alley west of Rucker Avenue to Grant <br /> Avenue) construct concrete curb and gutter on north <br /> side of 43rd, install storm drainage system (estimated <br /> project cost: $14 ,160) . <br /> 4 . $500 to Jackson Elementary School PTA towards estimated <br /> $2 , 400 playground equipment to be purchased by PTA. <br /> 5. Terrace Drive (42nd Street to 41st Street) , concrete <br /> curb and gutter on west side, install storm drainage <br /> system, asphalt resurfacing (estimated project cost : <br /> $34 , 150) . <br /> 6 . 35th Street at Hoyt intersection, install flashing sig- <br /> nal light for traffic control and pedestrian safety <br /> (estimated project cost: $8 , 140) . <br /> Section 3 : Should costs be less for the above projects than origin- <br /> ally estimated, projects receiving the next highest neighborhood <br /> priority shall be included for funding. If project costs exceed the <br /> estimates given, the lowest priority project or projects will be <br /> dropped for funding. <br /> Section 4 : If any of the above projects is started but not com- <br /> pleted, completion of the project (s) will be automatically funded <br /> with any 1982 Block Grant funds received by the neighborhood where <br /> an uncompleted project is located. <br /> Section 5 : All of the above projects shall conform to the require- <br /> ments of the City Ordinance 555-78 , as amended by City Ordinance <br /> 655-80. Determination of the appropriate standards to impose shall <br /> be made by the City Engineer. <br /> Section 6 : The total estimated cost of the improvements herein <br /> authorized is $337 , 700 which will include all costs related to <br /> design, construction, contract administration, plan development and <br /> associated costs. <br /> Section 7 : The City Engineer of the City of Everett under the <br /> administration of the Mayor is hereby given the responsibility of <br /> providing for the improvements as defined herein. <br /> (3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.