Laserfiche WebLink
Contingency Fee $ 2,000 <br /> TOTAL NOT TO EXCEED FEE $16,500 <br /> SCHEDULE <br /> Contigent upon the signed execution of this agreement a drill rig is scheduled for July 18,2018. It is anticipated that <br /> the report can be completed withing approximately 3 to 4 weeks after the fieldwork. Preliminary results of the <br /> investigation can usually be provided within two working days from completion of the fieldwork. <br /> OTHER CONDITIONS <br /> By Washington State Law,Geotest is required to provide 72 hours notice for utilities to be marked on the public <br /> perimeter of the property. Geotest should also be provided with any available information pertaining to onsite <br /> utilities that may be present. Despite best efforts to avoid utilities,utility damage is sometimes unavoidable due to <br /> mismarked or unlocatable facilities. The cost for utility repairs is not included in this cost estimate. <br /> All soil samples obtained during the subsurface investigation will be saved for a period of 60 days. They will then <br /> be discarded,unless requested otherwise. Our proposal for cost and scope of services is valid for 90 days from this <br /> date. If authorization to proceed occurs after 90 days,Geotest reserves the right to modify the scope and/or cost of <br /> such services. <br /> Page 14 <br /> (Form Approved by City Attorney's Office November 1,2009) <br />