C. Tenth Place West right-of-way is to be extended to the southerly property <br /> line. <br /> D. Hammer head for turn-around on 54th Place S.W. shall be constructed to <br /> City standards. <br /> 6. Water: All systems installed must be built to City standards and must be looped <br /> ! on site. <br /> A. Utilities easements shall be provided on tract B and C to service future <br /> development. <br /> I7. Sewer: All Sewer mains will be constructed to City standards. <br /> A. All utilities off public right-of-way shall have a minimum of 20 foot <br /> easement; where approved by Public Works, 15 feet will be accepted. <br /> B. The System Development Fee for the Southwest Sewer Interceptor will be <br /> $219.00 per unit for single-family dwellings; $248.00 per unit for two- <br /> family dwellings. <br /> C. Sponsor shall participate in the Southwest Everett Sewer L.I.D. <br /> 8. Drainage: All systems and detentions to be designed in conformance with City <br /> Drainage Ordinance (/1514-78). <br /> A. A minimum setback from stream or stream bank of 15 feet. <br /> B. Calculations must be submitted to indicate that units 3C, 4C, 42C, 43C, <br /> 44C, and 45C are out of the 25 year storm flood plain in an upstream <br /> developed condition and the flood plain shown in the present contoured <br /> grading plan. <br /> 9. Clearing and Grading Plan: A plan showing the extent of grading and the <br /> methods of controlling erosion shall be presented to the Planning and Public <br /> Works Department. Prior to initial submittal of an erosion control plan, the <br /> Sponsor shall meet with a representative of Utilities Division to discuss erosion <br /> control provisions, construction schedules and stream relocation specifications. <br /> ;10. Hydrology: All plans submitted for stream relocations shall be reviewed and <br /> approved by Public Works. <br /> A. The stream at the west end of the project must be drained through <br /> approved means. <br /> B. The stream at the east end of the project, when relocated, shall follow <br /> relocation specifications: <br /> 1. New creek channel shall be reseeded or otherwise stabilized prior to <br /> diversion of water into it. <br /> 2. Storm drains and detention pond shall be constructed and operational <br /> prior to initiation of any other clearing or construction work. <br /> ii <br /> II 3. The detention pond shall be utilized as a sedimentation pond during <br /> construction. After construction is completed, the accumulated <br /> sediment in the pond shall be removed. <br /> ii4. The amount of vegetation removed shall be no greater than that <br /> indicated by Subdivision Management's "Preliminary Clearing and <br /> Landscaping Plan" dated 12/1/80. <br /> fi <br /> Ij I, <br /> I , <br />