McClure and Sons Inc. 4/28/2018 Change Order 1
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 4/28/2018 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 9:30:13 AM
Creation date
7/11/2018 9:30:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
4/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Valve Bypass
Public Works WO Number
UP3611
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000810
Total Compensation
$47,856.09
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 9/28/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Three Lakes Valve Bypass <br /> Change Order No.1 <br /> Change Order Effective Date: March 20, 2018 <br /> ONTRACTOR <br /> I a <br /> By /Z Date: 1//14Zb I Y <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> This Change Order# 1 adds four(4) new items as shown below. <br /> Added Bid Item <br /> New Item # 101 —Additional Materials Costs. Add new item# 101 entitled, "Additional Materials <br /> Costs" at the agreed to lump sum price of$11,180.40, by adding One (1) lump sum Additional <br /> Materials Costs, resulting in an$11,180.40 increase to the Contract price. <br /> New Item # 102—Additional Restrained Welds. Add new item# 102 entitled, "Additional <br /> Restrained Welds" at the agreed to lump sum price of$9,128.00, by adding One (1) lump sum <br /> Additional Restrained Welds, resulting in a$9,128.00 increase to the Contract price. <br /> New Item# 103—Additional Labor and Equipment Costs. Add new item# 103 entitled, <br /> "Additional Labor and Equipment Costs" at the agreed to lump sum price of$12,547.69, by adding <br /> One (1) lump sum Additional Labor and Equipment Costs, resulting in a$12,547.69 increase to the <br /> Contract price. <br /> New Item # 104—Early Incentive Bonus. Add new item# 104 entitled, "Early Incentive Bonus" at <br /> the Contract specified maximum price of$15,000.00, resulting in a$15,000.00 increase to the Contract <br /> price. <br /> JUSTIFICATION <br /> New Item # 101 —Additional Materials Costs-Incurred costs in the following five areas. <br /> 1. 24-Inch Access Manway: This new item is being added at the west end of the 36-inch bypass <br /> pipe to provide a safer access for welders to weld inside pipe joints and greater flexibility for <br /> future maintenance access, and to account for costs to construct the manway. <br /> 2. Reinforced Concrete Vault Slab Lid: This new item is being added to replace the planned <br /> sheet metal cover for the Pressure Sustaining Valve access opening into the concrete valve <br /> Page 3 of 4 <br />