Laserfiche WebLink
Mr.Erik erson P.E. <br /> Mpg 2 <br /> ov� miler 3,2017 <br /> Response: The 4th Paragraph of the Project Overview in the 7030 Report has <br /> been revised to address the City of Everett's TDA threshold requirements <br /> 3. Downstream analysis and plan. City GIS indicates that the storm drainage system in <br /> Lower Ridge Road drains east from the catch basin located near the southeast corner of <br /> the property. Please indicate the pipes connecting the catch basins shown and the <br /> direction of flow. Response: The downstream analysis in both the 7030 and 7102 <br /> reports have been revised to show the runoff from the site draining into the catch <br /> basins located at the south-west corner of the site on Lower Ridge Road,then <br /> crossing the roadway, east, in the storm pipe for about 200 feet before flowing into <br /> Pidgeon Creek. <br /> Sincerely, <br /> Richard Deccio P.E. <br /> Deccio Engineering Inc <br />