z <br /> TASK 3 & 4: FIELD INSPECTION AND DESCRIPTION OF DRAINAGE SYSTEM WITH <br /> EXISTING AND PREDICTED PROBLEMS <br /> A Level 1 drainage analysis and "Off Site Analysis and Mitigation Study"meeting requirements outlined <br /> in Volume 1, Section 3.1.3 of the 2014 DOE SWWM Manual was performed. See Downstream <br /> Analysis Map. <br /> Level 1 Downstream Drainage Analysis: <br /> Section 1: Upstream Drainage Analysis: <br /> Based on the site contours there is no upstream runoff draining onto the site. <br /> A review of the upstream area indicated that there were no indications of problems observed. <br /> Section 2: On-site Drainage Considerations: <br /> All runoff from the site discharges along the east side of the site draining onto the catch basin storm <br /> systems serving Lower Ridge Road <br /> Section 3: Site to Lower Ridge Road to Pidgeon Creek#2 <br /> The runoff from the site leaves the property along the east side draining into the storm system serving <br /> Lower Ridge Road.From here it flows north in the storm system for about 200-feet before flowing into <br /> Pidgeon Creek.From here the creek flows north crossing under several streets and along the back yards <br /> of residential homes and continuing north for over 1-mile. <br /> There appeared to be no issues with the downstream drainage system or culverts. Where visible,the <br /> stream channel was well vegetated. However, nearly the entire downstream course was on private <br /> property and not accessible to inspection. <br /> TASK 5: LEVEL 1 MITIGATION OF EXISTING PROBLEMS <br /> The project proposes to mitigate the proposed site improvements through the use of LID measures <br /> including Splash Blocks requiring minimum of 50-ft flow paths through vegetation and driveway <br /> dispersal trenches. <br /> Conclusions: <br /> Based on the proposed mitigation and lack of problems noted downstream,the site development should <br /> have little if any impact on west side downstream conditions. <br /> 7102 Lower Ridge RD Full Drainage Report <br /> Revised:November 3,2017 Page 5 <br />