My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Department of Ecology (DOE) 6/26/2018
>
Contracts
>
6 Years Then Destroy
>
2021
>
WA ST Department of Ecology (DOE) 6/26/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 9:33:48 AM
Creation date
7/25/2018 9:33:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology (DOE)
Approval Date
6/26/2018
Council Approval Date
6/20/2018
End Date
12/31/2021
Department
Parks
Department Project Manager
Russell Dance
Subject / Project Title
Viola Ousler Viewpoint Wiggums Hollow Acccess
Tracking Number
0001330
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conditions of the reported issue, discussing the condition with the <br /> City, reviewing pre-existing photographs and documentation, <br /> and/or reviewing construction records applicable to the condition. <br /> 3. The fmdings of the investigation will be communicated to <br /> Ecology's Site Manager and the Everett Smelter Project Manager <br /> for evaluation and review. Based on the information available, <br /> Ecology will develop conclusions to respond to the investigation <br /> request or determine additional investigation is necessary to more <br /> completely evaluate the issue. If Ecology has determined that <br /> additional investigation is required,this shall not exceed 15 <br /> calendar days from the date the concern was submitted to ecology. <br /> 4. Ecology will communicate its investigation conclusions and <br /> response to the City within 7 (calendar days) from the date of the <br /> reported concern. <br /> 5. If the reported concern to Ecology is pertaining to erosion, failure <br /> of onsite best management practices or failure by the contractor to <br /> contain soil and arsenic laden soils from leaving the work site,this <br /> shall constitute an emergency and regardless of day or time, <br /> immediate actions will be taken by Ecology to direct the contractor <br /> to provide immediate solutions to resolve the specific issue. <br /> Ecology will commence with an investigation regarding the <br /> incident and will provide a written report to the city within 5 <br /> working days of the incident. A copy of the report shall be sent to <br /> the authority issuing the site specific SWMP. <br /> All findings and results of investigations shall be in writing. <br /> (10) Resolution of Disputes <br /> Ecology will resolve disputes with City representatives through <br /> investigations at the requests of City representatives and discussions <br /> between the City and Ecology's on-site field representatives. These field <br /> representatives are responsible for investigating and addressing City <br /> requests, as well as conveying the decisions of Ecology project staff <br /> regarding proposed additions, changes, deletions, or other actions <br /> pertaining to the Work. <br /> It is the responsibility of Ecology's on-site field representatives to bring <br /> investigation reports and potential disputes to the attention of Ecology's <br /> project manager. However,the City may also contact Ecology's project <br /> manager directly to report a disputed item of Work or disputed <br /> investigation conclusion. <br /> Dispute process: <br /> Owner Initials: °6 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.