Laserfiche WebLink
Project: Portal 1 Replacement <br /> Change Order No.01 <br /> Change Order Effective Date: 6/21/18 <br /> CONTRACTOR <br /> Date: , , /� <br /> . fic <br /> Exhibit A - Description of Changed Work <br /> Work Change Directive —No. 01 Fabricate and Install Pipe Adapter: WCD-001 is a <br /> lump sum revision for $4,862.93. WCD-01 added two calendar days. <br /> Justification: After demolition of the existing portal structure, it was discovered <br /> that the existing Diversion Dam pipe had a slight taper. The prefabricated wall <br /> spool for the new portal structure would not fit the existing pipe due to the slight <br /> taper. WCD-02 covers the additional costs to fabricate and install an adapter <br /> between the existing pipe and the portal wall spool. <br /> Work Change Directive —No. 02 Repair Holes in the Existing 90" x 72" Reducer <br /> Pipe : WCD-02 is a lump sum revision for $2,748.64. WCD-02 added no calendar days. <br /> Justification: During the 1984 installation of PUD's 72" pipe, holes were drilled in <br /> the mortar lining to hang lights. In the 90" x 72" reducer, the holes were drilled too <br /> deep and penetrated the steel pipe. Prior to the Portal 1 Project, in 1984 the holes <br /> were found on startup and repaired. The repairs were found to be leaking after <br /> water was placed back into the pipe, prior to backfilling. <br /> Contract Time: <br /> Two Calendar Days are being added to the contract by this change order. They are for <br /> WCD-001, for the following reasons. <br /> A. Installation of the pipe adaptor required removal of the mortar lining and coating <br /> from the existing reducer pipe. The 90" end of the reducer pipe had to be cut and <br /> Portal 1 Replacement June 21,2018 <br /> WO#UP3602 006363 -3 <br />