My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc. 7/10/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc. 7/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 9:54:06 AM
Creation date
7/25/2018 9:53:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc.
Approval Date
7/10/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP3470
Tracking Number
0001331
Total Compensation
$4,671,857.55
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> DATE: January 29, 2018 ADDRESS: PO Box 158 <br /> CONTRACTOR: KLB Construction, Inc. CITY/STATE: Mukilteo WA 98275 <br /> PROJECT TITLE: Sewer System Replacement & Capacity WORK ORDER NO. UP 3470-10 <br /> Improvement Sewer"M" Project, Phase 2 FINAL AMOUNT: $4,524,152.39 <br /> ATE WORK COMPLETE: December 21, 2017 Exclusive of State Sales Tax <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett, that the same or any part thereof has not been paid, and <br /> that I am authorized to sign for the claimant; that I have not rented or purchased any equipment or materials <br /> from any employee of the City; I further certify that the attached final estimate is a true and correct statement <br /> showing all the monies due me from the City of Everett under this contract; that I have carefully examined said <br /> final estimate and understand the same and that I hereby release the City of Everett from any and all claims of <br /> whatsoe nature whi I may have, arising out of the performance of said contract, which are not set forth in <br /> said I ate. <br /> CO TRAC OR TITLE <br /> KLB Construction, Inc. <br /> Subscribe4and sworn to before me this fl‘ii day of _ /,.,L,, 2Q+&2 vt S <br /> C� .r'' �F <br /> 0 _- <br /> ¢L !� 51oN `C( <br /> Notary Public '' oma•' 4:$• 1%' <br /> in and for the State of Washington, residing at ��� d N O TA R y - <br /> , PUBLIC LoY . .# <br /> ()F WASH' <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final estimate to be <br /> based upon actual measurements and to /a <br /> be true and correct. APP7,1 <br /> __VEDDa e: G/ !( <br /> X'��o�i✓ � X ctuD • <br /> Construction Manager Public orks Director <br /> Tom Fuchs Paul K anski <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 6/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.