My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc. 7/10/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc. 7/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 9:54:06 AM
Creation date
7/25/2018 9:53:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc.
Approval Date
7/10/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP3470
Tracking Number
0001331
Total Compensation
$4,671,857.55
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br /> Project: Sewer System Replacement & Capacity Improvement Sewer "M" Project, <br /> Phase 2 <br /> Contractor: KLB Construction Inc. <br /> Work Order UP 3470-10 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> • Gla� �s <br /> Public rks irector Date <br /> Paul Kaftanski <br /> Approved by: <br /> /1o(1 7( <br /> Mayo ' ty 41232FM Date <br /> : sie Frank 'n <br /> Attest: k 4._ <br /> ity Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> BY: i, — _ <br /> im les, City Atto <br /> 1 ; <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.