Laserfiche WebLink
CERTIFICATE OF COMPLETION <br /> Project: Sewer System Replacement & Capacity Improvement Sewer "M" Project, <br /> Phase 2 <br /> Contractor: KLB Construction Inc. <br /> Work Order UP 3470-10 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> • Gla� �s <br /> Public rks irector Date <br /> Paul Kaftanski <br /> Approved by: <br /> /1o(1 7( <br /> Mayo ' ty 41232FM Date <br /> : sie Frank 'n <br /> Attest: k 4._ <br /> ity Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> BY: i, — _ <br /> im les, City Atto <br /> 1 ; <br /> Date <br />