Laserfiche WebLink
Run Date: 1/19/2018 City of Everett-Public Works Department Cutoff Date: 1/12/2018 <br /> Time: 1:27 PM Contract Estimate Voucher <br /> 334' For Work Order#SchdA <br /> ProjectContractor: KLB CONSTRUCTION <br /> SEWER"M"-PHASE II Estimate#15 PO BOX 158 <br /> WO SchdA BID:$1,622,952.80 MUKILTEO, WA 98275 <br /> TOTAL BID:$4,710,393.51 <br /> Unit Plan Total Previous Present Total Previous Present <br /> !tem'# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0026 Manhole,72",Type 3 EA 14,250.00 1.00 1.0000 1.0000 0:0000 14,250.00 14,250.00 0.00 <br /> 0027 Manhole,84",Type 3 EA 18,500.00 1.00 1.0000 1.0000 0.0000 18,500.00 18,500.00 0.00 <br /> 0028 Manhole,Addtl Height 48",Type 1 LF 310.00 3.00 3.0000 3.0000 0.0000 930.00 930.00 0.00 <br /> 0029 Manhole,Addtl Height 54",Type 1 LF 350.00 24.00 24.0000 24.0000 0,0000 8,400.00 8,400.00 0.00 <br /> 0030 Manhole,Addti Height 60",Type 1 LF 500.00 1.00 1.0000 1.0000 0.0000 500.00 500.00 0.00 <br /> 0031 Manhole,Addtl Height 72",Type 3 LF 500.00 15.00 15.0000 15,0000 0.0000 7,500.00 7,500.00 0.00 <br /> 0032 Manhole,Addti Height 84",Type 3 LF 500.00 10.00 10.0000 10.0000 0.0000 5,000.00 5,000.00 0.00 <br /> 0033 Drop Manhole Connection EA 3,500.00 2.00 2.0000 2,0000 0.0000 7,000.00 7,000.00 0.00 <br /> 0034 Combined Sewer Pipe,10"Dia. LF 62.15 226.00 226.0000 226.0000 0.0000 14,045.90 14,045.90 0.00 <br /> 0035 Combine Sewer Pipe,12"Dia. LF 68.20 485.00 484.0000 484.0000 0.0000 33,008.80 33,008.80 0.00 <br /> 0036 Combined Sewer Pipe,21"Dia. LF 75.15 962.00 961.0000 961.0000 0.0000 72,219,15 72,219.15 0.00 <br /> 0037 Combined Sewer Pipe,24 Dia, LF 138.50 971.00 971.0000 971.0000 0.0000 134,483.50 134,483.50 0.00 <br /> 0038 HDPE Pipe/Sanitary Sewer FM,12"dia. LF 71.40 1,219.00 1,308.0000 1,308.0000 0.0000 93,391.20 93,391.20 0.00 <br /> 0039 Side Sewer Connection EA 2,430.00 63.00 64.0000 64.0000 0.0000 155,520.00 155,520.00 0.00 <br /> 0040 Concrete Curb,Type E-1 LF 27.40 400,00 282:0000 282.0000 0.0000 7,726:80 7,726.80 0.00 <br /> 0041 Cement Concrete Drive Entrance,Type 3 SY 62.60 120.00 113.4000 113.4000 0.0000 7,098.84 7,098.84 0.00 <br /> 0042 Cement Concrete Sidewalk,4"Thick SY 50.00 60.00 94.7000 94.7000 0.0000 4,735.00 4,735.00 0.00 <br /> 0043 Concrete Perpendicular Curb Ramp EA 2,350.00 2.00 3.0000 3.0000 0.0000 7,050.00 7,050.00 0.00 i <br /> 0044 Concrete Parallel Curb Ramp EA 2,350.00 1.00 1.0000 1.0000 0.0000 2,350.00 2,350.00 0.00 <br /> 0045 Survery Monuments EA 600.00 2.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0046 Pavement Marking LS 13,000.00 1.00 1.0000 1.0000 0.0000 13,000.00 13,000.00 0.00 <br /> 0047 Grass Seed and Topsoil,Type A SY 8.25 270.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0048 Force Account FA 1.00 100,000.00 15,807.3800 13,803.6200 2,003.7600 15,807.38 13,803.62 2,003.76 <br /> 0049 Stop Gate and Frames LS 7,500.00 1.00 1.0000 1,0000 0.0000 7,500.00 7,500.00 0.00 <br /> Work Order Totals: 1,587,705.41 1,575,201.65 12,503.76 <br />