Laserfiche WebLink
_URI GENERAL NOTES: <br /> PREUMINARY LOCATION OF °RELOCATED u nom _ MATCH LINE — SEE BELOW LEFT <br /> FUTURE UTILITY TRANSFORMER. PANELBOARD WIRELESS ' 0.75"C. Pt...T01 I TEE - -- --` -- --�-- 1. GENERAL: WORK SHALL BE DONE IN ACCORDANCE WITH CODES AS ADOPTED BY THE <br /> NOT PART OF THIS CONTRACT OANTENNA )114?1,1 <br /> I 1 1 EXISTING WAREHOUSE 121 I CITY OF EVERETT,SNOHOMISH COUNTY,AND THE STATE OF WASHINGTON. <br /> • 206/12ov, 10, 200A, BUILDING 2. LOCATIONS OF ELECTRICAL DEVICES,LIGHTING FIXTURES,ETC.,INDICATED ON CIVIL <br /> '� EXIST. L}I71gG POLE I l I <br /> WALL 2-4"C. E E.______ _ s - (TO BE DEMOLISHED) EXISTING WALL /STRUCTURAL PLANS-INCLUDING SECTIONS,ELEVATIONS,NOTES,OR OTHER <br /> EXISTINGSTISERVICE0 2-4"C. COM �- .06____,\_________I 1 MOUN m, SERVICE k 1 I <br /> I INDICATORS-TAKE PRECEDENCE OVER LOCATIONS SHOWN ON ELECTRICAL <br /> DI . .. CT /--0913`- �' 1-4"C E DISCON CT ' DRAWINGS. <br /> 0 .�,,Cc� •�� �� RP�j,m 3-2"C. TEL/CBL dr <br /> I I <br /> i� y�fik r -- 2-1"C. COM 0 3. REFER TO CIVIL,STRUCTURAL,MECHANICAL,ETC.,DRAWINGS FOR WORK IN OTHER <br /> C © 2-0.75"c. E/LTc �, DIVISIONS. INFORMATION CONVEYED WITHIN THE ELECTRICL DRAWINGS <br /> TYPICAL FOR 0.75"C. 212�12G z III ILLUSTRATING OR REFERENCING WORK OF OTHER DIVISIONS IS FOR REFERENCE <br /> , i 6 LOCATIONS `� ko IMAGE • r.$ x ONLY. SPECIFICATION BY THE APPROPRIATE DIVISIONS SHALL APPLY. <br /> ir �..m.,'. \\\ MDB SOUTH)6OOA W d III 4. GENERALNOTES ARESHOWNONSHEETSMOST RELEVANT TOSPECIFIC NOTE;0(E)WIRELESSi�`'�- 10 EXISTING SEWER000 K <br /> �. ��� 48077-240/IRON, 30, O HOWEVER,GENERAL NOTES ON EACH SHEET SHLL APPLY IN PRACTICE TO ALL <br /> ANTENNA .�>! UFT STATION <br /> �• ::a`.�JI�� IMAGE 0.75'C. E(VERIFY) ELECTRICAL DRAWINGS. <br /> (RELOCATED), _ III I 5. NOT ALL COMPONENTS OF THE ELECTRICAL SYSTEMS ARE SHOWN(FOR SIMPLICITY). <br /> UTIL. XFMR <br /> WEYERHAEUSER TORZSTR. 'hip,• 3x100KVA \\\ 4-1.5'C. E('603 ) / III <br /> I I I I PROVIDE MATERIALS AND LABOR NECESSARY FOR A COMPLETE AND OPERATIONAL <br /> BUILDING RetCICA- A-XX, A-XX, A-XX \\ 2'C P( 100.3 ) I III ' SYSTEM. <br /> • 1— \ \ O NEW 100A LOADCENTER, 11 6. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC. EXACT LOCATIONS OF ELECTRICAL <br /> • <br /> / (RACK MOUNTED) EQUIPMENT ARE APPROXIMATE. CHANGES MADE BY THE OWNER IN COATING <br /> J x' I <br /> I ELECTRCAL COMPONENTS OF UP TO TEN FEET HORIZONTALLY IS A PART OF THIS <br /> I <br /> �, 0 1 CONTRACT.THESE CHANGES MAY BE IMPLEMENTED,AT NO CHARGE TO THE OWNER. <br /> Of1 F I UTIL. + LTG--- \\\ I T 1 I 1 I 7. COORDINATE LOCATIONS OF ELECTRICAL AND COMMUNICATION RACEWAYS AND <br /> f ICONDUITS WITH OTHER TRADES. ADJUST LOCATIONS AS NECESSARY TO AVOID <br /> - IMAGE I 1\ I x I I I ' CONFLICTS. <br /> 111I 8. COORDINATE WITH OWNER AND PUD THE LOCATION OF POLE SO AS NOT TO <br /> SUBMETER \\\ x j O I III INTERFERE WITH FUTURE INSTALLATION OF HARDSCAPE AND UTILITIES.LOCATE <br /> EXISTING- <br /> FURNISH 1 ff POLE IN FUTURE LANDSCAPE AREA <br /> Mt 1tKS o FURNISH AND INSTALL \ 1 i-2"C. P�sl•�`U" ' 1 I I 9. CONDUCTORS SHALL BE LABELED IN ALL JUNCTION BOXES AND AT ALL <br /> eel" <br /> NEW ELECTRICAL RISER \\ y( TERMINATIONS. <br /> 0 AND WEATHERHEAD AS \ x x 1 I I <br /> IMAGE ELECTRICAL SERVICE '© REQUIRED TO \\ / / I 10. SCOPE OF WORK: THE SCOPE OF ELECTRICAL WORK FOR THIS PROJECT INCLUDES BUT <br /> DROP IMAGE RECONNECT SERVICES \\ x 11 x I <br /> II IS NOT LIMITED TO THE FOLLOWING: <br /> 1 <br /> 0 ELECTRICAL SERNCE ' 1 A. PREPARATION OF BUILDING PRIOR TO MOVE: DISCONNECT EXISTING ELECTRICAL <br /> POLE& TRANSFORMER, \ x 1 ',I I 1 I AND COMMUNICATIONS LINES/SERVICES FROM THE WEYERHAEUSER BUILDING. <br /> BY PUD \\\ ' I ' I I I COORDINATE WITH THE SERVING POWER AND COMMUNICATIONS PROVIDERS FOR <br /> THE REMOVAL OF UTILITY OWNED LINES. REMOVE AND DISPOSE OF MATERIALS <br /> \` ', �I x <br /> III THAT WILL NOT BE(RE)USED AFTER THE BUILDING MOVE. TEMPORARILY REMOVE <br /> ELECTRICAL POWER AND COMMUNICATIONS MATERIALS AND EQUIPMENT AS <br /> '' \\\ j xI III NECESSARY FOR TRANSPORTING THE BUILDING;RETAIN FOR INSTALLATION <br /> AFTER TRANSPORT. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES AND <br /> ()OVERHEAD SERVICE I \\\ 1 1 I I I I CONDUCT A DETAILED SITE INSPECTION PRIOR TO BIDDING TO VERIFY THE <br /> LATERAL BY PUD \\` ' \\\ <br /> 1 / 100A METER/PANEL--\ III EXTENT OF ELECTRICAL AND TELECOM EQUIPMENT WORK PARTICULAR <br /> ATTENTION SHALL BE PAID TO UNDERFLOOR/BASEMENT LEVEL ELECTRICAL LINES <br /> ', AND EQUIPMENT. MAKE SAFE AND PROTECT INTERIOR SYSTEM COMPONENTS. <br /> \\ POLE x THIS CONTRACT INCLUDES REPLACING EQUIPMENT AND MATERIALS DAMAGED <br /> \ \ / ar ' III DURING TRANSPORT. <br /> ',EXISTING I I I B. EXISTING SITE(AFTER BUILDING MOVE): THE EXISTING(SNOPUD)PAD MOUNTED <br /> UTILITY / SERVICE POLE--i . <br /> POLE 0/H UTILITY UNE---\\N8TRANSFORMER WILL REMAIN`?IN PLACE TO SERVE SIGN LIGHTING AND TO PROVIDE <br /> FUTURE POWER FOR CONSTRUCTION AFTER THE BUILDING IS MOVED. PROVIDE <br /> rn / --x NEMA 3R ELECTRICAL SERVICE PEDESTAL WITH METER MAIN(50-AMP, <br /> o ��� ' I III 120/240-VOLT MAIN)AND BRANCH DISTRIBUTION FOR(6)1 P-20AMP BRANCH <br /> m MATCH LINE - SEE ABOVE RIGHT I III BREAKERS-MILLBANK OR EQUAL. METER BASE SOCKET PER SNOHOMISH PUD <br /> � _w r IMAGE (SNOPUD)STANDARDS. PROVIDE 18"x 18"x 10"t CONCRETE HOUSEKEEPING PAD <br /> I I 1 FOR SERVICE PEDESTAL. INTERCE;T EXISTING UNDERGROUND BRANCH <br /> WEYERHAEUSER BUILDING ELECTRICAL SITE PLAN 0 510 20 40 60 RESTROOM ELECTRICAL SITE PLAN 0 5 10 20 40 60 CIRCUITS TO SIGN LIGHTING CIRCUITS AND CONNECT TO METER PEDESTAL USING <br /> UNDERGROUND RACEWAYS. PROVIDE VEHICLE RATED PROTECTIVE PIPE <br /> SCALE: 1" = 20-O" SCALE: 1" = 20-O" BOLLARDS AROUND PUD TRANSFORMER AND METER PEDESTL. <br /> 3 C. RECONNECTION AT FINAL LOCATION: MAKE CONNECTIONS AS SHOWN IN THESE <br /> I SHEET. NOTES: DRAWINGS. (RE)INSTALLTEMPORARILY REMOVED ELECTRIALAND <br /> COMMUNICATION EQUIPMENT AND MATERIALS AFTER BUILDING IS PLACED IN <br /> v9 O POLECOORDIWITH SNOPUD.REFER TTE INSTALLATION OF NEW O SHEET C1.01 ICAL FOR ORE ICE AND O WWITMOVE AND H NEW 100A,120/240V, <br /> LACE 0/240V 10 FEEDERO NEW LOADCENTER.ISTING 100A,120/240V,10 FEEDER 10 EXISTING SEWETOR R LIFT STATIONL FIELD RIFY AND PROUIREMENTS OF FINAL LOCATION.VIDE AND INSTALL CONNECTIONS-SNOPUD,INATE WITH UTILITY COM AST,AND FRONTIEROANY PROVIDERS FOR SERVICE <br /> COMMUNICATIO S. TEST ALL <br /> - <br /> COORDINATE. WORK AS REQUIRED TO RECONNECT TO NEW POWER SOURCE ELECTRICAL CIRCUITS AND FEEDERS PRIOR TO PROJECT COMPLETION. REPAIR <br /> w 0 RELOCATE EXISTING WIRELESS ANTENNA EQUIPMENT TO SHOWN. DAMAGED OR FAILED COMPONENTS. <br /> O DISCONNECT AND REMOVE EXISTING RESTROOM ELECTRICAL EXISTING LIGHTING POLE SHOWN.INSTALL NEW 20A DUPLEX D. PERMITS:GIVE ALL NECESSARY NOTICES,OBTAIN ALL PERMITS AND PAY ALL <br /> SERVICE.REMOVE UNDERGROUND CONDUIT AND WIRE AS (GFCI)RECEPTACLE WITH WEATHERPROOF-IN-USE COVER. GOVERNMENT TAXES,FEES AND OTHER COSTS IN CONNECTION WITH THIS WORK. <br /> o REQUIRED TO ALLOW FOR NEW CONSTRUCTION. COORDINATE RELOCATION AND SERVICE INTERRUPTION WITH OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION OF THE WORK AND DELIVER <br /> r PORT OF EVERETT. SAME TO ENGINEER AT TIME OF SUBSTANTIAL COMPLETION AND BEFORE <br /> RELABEL EXISTING 60A RESTROOM CIRCUIT BREAKER AS <br /> m 3 REQUEST FOR FINAL PAYMENT. <br /> "SPARE".INSTALL NEW 20A,120V CIRCUIT BREAKER TO FEED 0 INTERCEPT AND MODIFY EXISTING UNDERGROUND SERVICE E. PHASING:PHASED INSTALLATION OF THE ELECTRICAL WILL BE NECESSARY. <br /> NEW RECEPTACLE FOR RELOCATED WIRELESS ANTENNA. CONDUIT AS NEEDED TO CONNECT ELECTRICAL FEEDER TO COORDINATE MOBILIZATION AND DEMOBILIZATION REQUIREMENTS WITH THE <br /> NEW LOADCENTER. GENERAL CONTRACTOR. <br /> i O INSTALL 2-3"PVC CONDUIT SLEEVES THROUGH CONCRETE <br /> FOUNDATION AT-18"BELOW FINISHED GRADE FOR FUTURE O PROVIDE AND INSTALLF. ELECTRICAL SERVICE:COORDINATE ELECTRICAL SERVICE ARRANGEMENTS WITH <br /> 100A 120/240V,10,NEMA 3R SERVING ELECTRICAL UTILITY(SNOPUD).INSTALLATION SHALL BE IN COMPLIANCE <br /> 3 USE.CAP EACH SIDE OF SLEEVE. LOADCENTER AS REQUIRED TO FEED RESTROOM PANELBOARD LEGEND: WITH UTILITY COMPANY STANDARDS.FURNISH AND INSTALL COMPONENTS OF <br /> AND SEWER LIFT STATION PUMP AND CONTROLS. <br /> CONTRACTOR SHALL COORDINATE WITH BUILDING DEMOLITION ELECTRICAL SERVICE EQUIPMENT,CONDUITS,BOXES,VAULTS,ETC.,IDENTIFIED <br /> O EXISTING 100A,240V,1fl METER/MAIN TO BE REUSED TO FEED <br /> $ RELOCATED RESTROOM AND EXISTING SEWER LIFT STATION. CONTRACTOR AND INSTALL RACK MOUNTED LOADCENTER IN 'l x I` IMAGE/PICTURE: REFER TO SHEET E1.02 FOR IMAGES IN CURRENT UTILITY COMPANY STANDARDS AS OWNER PROVIDED. <br /> m CONJUNCTION WITH BUILDING DEMOLITION IN ORDER TO `J <br /> c MAINTAIN SEWER LIFT STATION OPERATION.REFER TO SINGLE ( X.XX ) FEEDER TAG: SEE COPPER FEEDER SCHEDULE, SHEET E1.02 11 WEYERHAEUSER BUILDING TION OF CONTRACTOR SHALL PROVIDE WORK <br /> ° LINE WIRING DIAGRAM ON SHEET E1.02. REQUIRED FOR DISCONNECTION OF EXISTING BUILDING UTILITY SERVICES(IE.POWER, <br /> c COMMUNICATIONS,CABLE,ETC.)AT EXISTING BUILDING SITE IN ORDER FOR BUILDING <br /> O SHEET NOTE TO BE RELOCATED.COORDINATE SERVICE DISCONNECTION WITH BUILDING SERVICE <br /> PROVIDERS PRIOR TO STARTING WORK. <br /> o IF THIS DRAWING IS NOT <br /> W 22"x34" SCALE ACCORDINGLY. <br /> 3 <br /> o . <br /> PROJECT ENGINEER, SCALE: PORT OF EVERETT DWG. NO. <br /> E ® ® I ® PND ENGINEERS,INC.IS NOT RESPONSIBLE FOR SAFETY y E. DAVID 1" = 2V—O" <br /> PROGRAMS,METHODS OR PROCEDURES OF OPERATION,OR THE - . E 1.01 <br /> P CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. e DESIGNED BY: DATEc WATERFRONT PLACE CENTRAL <br /> o +Ort Q ENGINEERS,INC. 4 jr�''' HRRBOR FULLER WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, �`� •41FA ' EJD/JRC JANUARY 2016 CIP N0. 3-8-003-02 <br /> a [p 5 1.F e e S 1 5 c, THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF E , <br /> , ; 1736 Fourth Avenue S.,Suite INDUSTRY.DRAWINGS ARE FOR USE ON THIS PROJECT ONLY , �. . BRAWN BY: CHECKED BY: WEYERHAEUSER BUILDING RELOCATION <br /> •Q P.O.emc sae SnMc,Washington 98134 „ ... /\ / AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN J. CAMPBELL <br /> A\2/25 16 EJD ISSUED FOR BID AND ...;,. EJD PROJECT <br /> o 56Eri' A porus APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED .� ELECTRICAL SITE PLAN TR—WH-2016-01 <br /> = P:zo6 62413s7 CONSTRUCTION NO <br /> (425)2DR-B64 IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT y:?+\ APPROVED <br /> 7 U "' ''Pnden&n 'c°n' DIRECTLY OR INDIRECTLY TO PND. A97'" �. :,, - -" ._ , <br /> HPE PROJECT NUMBER,2015-001 NO. DATE BY REVISION SHEET NO. 20 OF 21 <br /> y iin� <br />