My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 745-80
>
Ordinances
>
Ordinance 745-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2018 10:27:12 AM
Creation date
7/30/2018 10:27:09 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
745-80
Date
12/3/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Repair of Wiggums Hollow Park <br /> (Estimated Cost: $10,000) <br /> 4. Curbs, gutters, drainage and sidewalks on the east and <br /> west sides of the 1300 and 1400 blocks of Maple and an <br /> asphalt overlay on the existing roadbed in the 1300 <br /> and 1400 blocks of Maple. <br /> (Estimated Cost: $72,954) <br /> 5. Sidewalk on the west side of Walnut from 9th to Butler <br /> (Estimated Cost: $4,108) <br /> 6. Sidewalk on the NW 140 feet of 17th Street between <br /> Cedar and Pine. <br /> (Estimated Cost $2,000) <br /> D. Lowell Neighborhood Improvements - (as amended by Lowell residents <br /> October 16, 1980) : <br /> 1. Planning Study of Lowell <br /> (Estimated Cost: $20,000) <br /> 2. Lowell Land Acquisition and Park Improvements <br /> (Estimated Cost: $25,000) <br /> 3. Unbreakable covers for lights in Lowell Park and more <br /> lighting <br /> (Estimated Cost: $3,000) <br /> 4. Unenclosed shelter with electrical outlets in Lowell <br /> Park <br /> (Estimated Cost: $40,000) <br /> 5. Completion of walkway from Broadway to I-5 overpass on <, <br /> Lowell Road <br /> (Estimated Cost: $7,625) <br /> 6. Assistance to Lowell , through the Council for a -i <br /> Greater Everett, with its neighborhood meetings, <br /> notices, and citizen participation, up to a maxi- <br /> mum of $875. <br /> 7. Guardrail along walkway on Lowell Road, west of 4th <br /> Avenue. <br /> (Estimated Cost: $500) <br /> 8. Lowell Cleanup <br /> (Estimated Cost: $500) <br /> Section 9: <br /> A. The sum of $424,000 is hereby appropriated to Fund No. 333, <br /> "1979 Block Grant Neighborhood Improvements" , as follows: <br /> 1. Program 739, Riverside Neighborhood $74,000 <br /> Improvements <br /> 2. Program 740, Port Gardner Neighborhood 80,900 <br /> Street and Sidewalk Improvements <br /> 3. Program 741, Port Gardner Neighborhood 4,100 <br /> Traffic Improvements <br /> 4. Program 742, Port Gardner Neighborhood 15,000 <br /> Improvements <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.