Laserfiche WebLink
4. Five street lights and poles: <br /> a. northwest corner of Wall and Federal inter- <br /> section <br /> b. mid-block on west side of 2900 Nassau <br /> c. northwest corner of Wall and Nassau inter- <br /> section <br /> d. mid-block on west side of 3000 Nassau <br /> e. northwest corner of Pacific and Nassau inter- <br /> section <br /> (Estimated Cost: $3,500) <br /> 5. Sidewalk (driveway) repair at 3617 Rockefeller. <br /> (Estimated Cost: $300) <br /> 6. Improvements on 38th and 39th between Friday and Grand <br /> up to a maximum of $25,000 in the following priority: <br /> a. curbs , gutters, sidewalk and rockery on north <br /> side and street repairs on 38th <br /> (Estimated Cost: $17,793) <br /> b. curbs, gutters and sidewalk on north side and <br /> street repairs on 39th <br /> (Estimated Cost: $14,568) <br /> 7. Complete any 1979 or 1980 Port Gardner Neighborhood <br /> Projects that were approved by the City Council in <br /> 1979 and 1980 but cannot be completed with 1979 or <br /> 1980 Port Gardner Block Grant Funds up to a maximum <br /> of $15,000. <br /> 8. Extruded cement concrete curbs on both sides of Norton <br /> Bridge (3300 Block) <br /> (Estimated Cost: $3,135) <br /> 9. Completion of Item #6 above, if not completed with <br /> budgeted $25,000. <br /> 10. Sidewalk reconstruction on Gedney and Wall in the <br /> following priority: <br /> a. Sidewalk reconstruction on west side of Gedney <br /> (Estimated Cost: $1,350) <br /> b. Sidewalk reconstruction on Wall from Nassau to <br /> Bond <br /> (Estimated Cost: $1,740) <br /> C. Northeast Everett Neighborhood Improvements: <br /> 1. Curbs, gutters and drainage on NW 140 feet on 17th <br /> Street between Cedar and Pine. <br /> (Estimated Cost: $3,213) <br /> 2. Curbs, gutters, drainage and sidewalk on the west side <br /> of Pine Street between 9th and 10th and a 22 foot <br /> asphalt roadbed along the Pine Street right-of-way <br /> between 9th and 10th. <br /> (Estimated Cost: $54,777) <br /> 2 <br />