My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT PUBLIC WORKS 00 21 13 <br /> SPECIAL PROVISIONS INSTRUCTIONS TO BIDDERS <br /> ' 2. Notify Owner if documents are incomplete. <br /> B. Immediately notify Owner upon finding discrepancies or omissions in Bidding Documents. <br /> 1.9 SITE EXAMINATION <br /> 1 A. Examine Project Site before submitting a Bid. <br /> 1. Inspect site of the Work by personal examination,physical testing,or by such other means <br /> as Bidder prefers, of the location of the proposed Work, the actual physical conditions of <br /> and at the Site, surface and subsurface conditions, and conditions ordinarily to be <br /> encountered and generally recognized as inherent in the Work. <br /> ' 2. If, during the course or as a result of such inspection, examination and testing, a Bidder <br /> finds facts or conditions that appear to conflict or are omitted from the Contract <br /> Documents,or with other data or material made available relating to the Work,Bidder shall <br /> so notify the City in writing, and may apply to the City for additional information and <br /> explanation before submitting their Bid. <br /> ' 1.10 INQUIRIES AND ADDENDA <br /> A. Should a Bidder find what is believed to be discrepancies in or omissions from the Drawings or <br /> Specifications, or should the Bidder be in doubt as to their meaning, Bidder may submit to the <br /> 1 City an emailed or faxed written request for an interpretation. <br /> B. Direct all questions in writing to John Nottingham,PE,at 3200 Cedar Street,Everett, WA 98201, <br /> ' facsimile(425)257-8882 or e-mail to jnottingham@everettwa.gov. <br /> C. Verbal answers are not binding on any party. <br /> 1 D. Submit questions not less than seven days before date set for receipt of Bids. <br /> E. Addenda: <br /> 1 1. Replies will be made by Addenda, which may be issued during Bidding period. <br /> ' 2. Addenda will be published online on Washington Builders Exchange website. <br /> 3. Addenda become part of Contract Documents. <br /> F. Include resultant costs in Bid Sum. <br /> ' 1.11 PRODUCT SUBSTITUTIONS <br /> A. Requests for product substitutions will not be accepted before execution of Contract; refer to <br /> Section 01300. <br /> 1 <br /> PROCESS WATER PUMP STATION April 19, 2018 <br /> WO-3647 00 21 13 - 3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.