My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT PUBLIC WORKS 00 21 13 <br /> SPECIAL PROVISIONS INSTRUCTIONS TO BIDDERS <br /> B. Changes in the Work: , <br /> 1. In submitting substitutions to specified products,Bidders shall include changes required in <br /> the Work and changes to Contract Time, Contract Sum, and [to accommodate such <br /> approved substitutions in their Bid. <br /> 2. Later claims by the Bidder for an addition to the Contract Time or Contract Sum because <br /> of changes in Work necessitated by use of substitutions will not be considered. 1 <br /> C. Approval to submit substitution requests prior to submission of Bids is not required. <br /> 1.12 SUBMISSION PROCEDURE <br /> A. Bidders shall be solely responsible for delivery of Bids in manner and time prescribed. 1 <br /> B. Submit one copy of executed offer on provided Bid Forms found in the Contract Documents, <br /> signed and sealed with required security deposit in a closed opaque envelope, and clearly <br /> identified with Bidder's name and address, Project name and number, and Owner's name on <br /> outside. <br /> C. The submission of a Bid by the Bidder shall constitute acknowledgment that, in preparing and <br /> submitting a Bid, Bidder has not only reviewed the Contract Documents, Bidder is also relying <br /> on their own knowledge,examination, inspection, and testing of: <br /> 1. the Site of the Work, ' <br /> 2. access to the Site, <br /> 3. environmental factors, <br /> 4. all other data,matters and things requisite to the fulfillment of the Work, <br /> 5. conditions ordinarily to be encountered and generally recognized as inherent in the Work, <br /> 6. available services and utilities at and in the vicinity of the Site of the Work, and 1 <br /> 7. all applicable federal, state and local statutes, ordinances, and regulations dealing with <br /> building, public health and safety, or with the prevention of environmental pollution and <br /> the preservation of public natural resources, and environmental assessments or impact <br /> statements which have been prepared relating to the Work. <br /> D. Bidder acknowledges that he/she has not relied on representation or warranty of the City not 1 <br /> expressly included in the Contract Documents. <br /> E. The information provided by the City is not intended to be a substitute for, or a supplement to, <br /> the independent verification by the Bidder to the extent such independent investigation of the <br /> Drawings and Specifications or Site conditions is deemed necessary or desirable by the Bidder. <br /> F. Bidder acknowledges that they have not relied upon City or Engineer furnished information <br /> regarding site conditions in preparing and submitting a Bid. <br /> G. An abstract summary of submitted Bids will be made available to all Bidders following Bid <br /> opening. <br /> PROCESS WATER PUMP STATION April 19, 2018 <br /> WO-3647 00 21 13 - 4 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.