Laserfiche WebLink
1 <br /> CITY OF EVERETT PUBLIC WORKS 00 21 13 <br /> SPECIAL PROVISIONS INSTRUCTIONS TO BIDDERS <br /> B. Changes in the Work: , <br /> 1. In submitting substitutions to specified products,Bidders shall include changes required in <br /> the Work and changes to Contract Time, Contract Sum, and [to accommodate such <br /> approved substitutions in their Bid. <br /> 2. Later claims by the Bidder for an addition to the Contract Time or Contract Sum because <br /> of changes in Work necessitated by use of substitutions will not be considered. 1 <br /> C. Approval to submit substitution requests prior to submission of Bids is not required. <br /> 1.12 SUBMISSION PROCEDURE <br /> A. Bidders shall be solely responsible for delivery of Bids in manner and time prescribed. 1 <br /> B. Submit one copy of executed offer on provided Bid Forms found in the Contract Documents, <br /> signed and sealed with required security deposit in a closed opaque envelope, and clearly <br /> identified with Bidder's name and address, Project name and number, and Owner's name on <br /> outside. <br /> C. The submission of a Bid by the Bidder shall constitute acknowledgment that, in preparing and <br /> submitting a Bid, Bidder has not only reviewed the Contract Documents, Bidder is also relying <br /> on their own knowledge,examination, inspection, and testing of: <br /> 1. the Site of the Work, ' <br /> 2. access to the Site, <br /> 3. environmental factors, <br /> 4. all other data,matters and things requisite to the fulfillment of the Work, <br /> 5. conditions ordinarily to be encountered and generally recognized as inherent in the Work, <br /> 6. available services and utilities at and in the vicinity of the Site of the Work, and 1 <br /> 7. all applicable federal, state and local statutes, ordinances, and regulations dealing with <br /> building, public health and safety, or with the prevention of environmental pollution and <br /> the preservation of public natural resources, and environmental assessments or impact <br /> statements which have been prepared relating to the Work. <br /> D. Bidder acknowledges that he/she has not relied on representation or warranty of the City not 1 <br /> expressly included in the Contract Documents. <br /> E. The information provided by the City is not intended to be a substitute for, or a supplement to, <br /> the independent verification by the Bidder to the extent such independent investigation of the <br /> Drawings and Specifications or Site conditions is deemed necessary or desirable by the Bidder. <br /> F. Bidder acknowledges that they have not relied upon City or Engineer furnished information <br /> regarding site conditions in preparing and submitting a Bid. <br /> G. An abstract summary of submitted Bids will be made available to all Bidders following Bid <br /> opening. <br /> PROCESS WATER PUMP STATION April 19, 2018 <br /> WO-3647 00 21 13 - 4 <br /> 1 <br />