I <br /> D. In special circumstances where a particular item of equipment is placed in continuous service <br /> before Substantial Completion of all the Work,the correction period for that item may start to run <br /> from an earlier date if so provided in the Specifications. <br /> E. Where defective Work (and damage to other Work resulting there from) has been corrected or I <br /> removed and replaced under 8.7 Defective Work, the correction period hereunder with respect to <br /> such Work will be extended for an additional period of one year after such correction or removal <br /> and replacement has been satisfactorily completed. , <br /> F. Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation or <br /> warranty. The provisions of this Paragraph 8.10 shall not be construed as a substitute for or a <br /> waiver of the provisions of any applicable statute of limitation or repose. <br /> ARTICLE 9 MEASUREMENT AND PAYMENT <br /> 9.1 Payments to Contractor 1 <br /> A. Schedule of Values <br /> 1. The Contractor shall submit a Schedule of Values at least 15 days prior to submitting its first <br /> Application for Payment. If the Project contains Unit Price Work, in whole or in part, then <br /> the Schedule of Values for that portion of the Work shall also be based on unit prices. If the <br /> Bid form calls for a lump sum price, in whole or in part, then the Schedule of Values shall: <br /> reasonably allocate the Contract Sum among the various portions of the Work; be complete; <br /> be organized to include detailed breakdown of each major unit of the Work; be organized to <br /> correspond to Contractor's schedule; break down the Contract Sum showing the value <br /> assigned to each part of the Work; include an allowance for profit and Overhead; include <br /> Unit Price Work, if and to the extent indicated on the Bid form; be so organized as to <br /> facilitate assessment of work and payment of Subcontractors; and be balanced. To the <br /> greatest extent possible, the breakdown shall use the same tasks or units as the Contractor's <br /> schedule. Contractor shall provide documentation substantiating the cost allocation if asked <br /> by the Owner's Representative. Upon acceptance of the Schedule of Values by the Owner's <br /> Representative, it shall be used as a basis for all requests for payment. <br /> B. Progress Payments <br /> 1. Payment Request Procedures: 111 <br /> a. By the tenth day of each month, or by schedule mutually agreed upon in writing by the <br /> Contractor and Owner's Representative, the Contractor shall submit to the Owner's <br /> Representative a partial payment estimate filled out and signed by the Contractor ' <br /> covering acceptable Work performed during the previous month,or since the last partial <br /> payment estimate was submitted. Contractor's submission of a progress pay estimate <br /> constitutes a material representation by the Contractor that it performed all of the Work <br /> described in the progress pay estimate during the relevant time period in a workmanlike <br /> manner and that the materials for which payment is requested reasonably conform to <br /> the Specifications and are either on the job Site or have been installed. If requested by <br /> the Owner's Representative,the Contractor shall provide such additional data as may be <br /> reasonably required to support the payment estimate. Such data may include <br /> satisfactory evidence of payment for Equipment, materials and labor including <br /> payments to Subcontractors and Suppliers. Certified invoices by the Suppliers shall <br /> accompany a request for payment for delivered Equipment and material. Such <br /> Equipment and material shall be suitably and safely stored at the Site of the Work. <br /> Payment requests shall summarize accepted operating and maintenance material with <br /> PROCESS WATER PUMP STATION 06/13/2017 <br /> WO-3647 00 72 13 -38 <br /> I <br />