Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' request for Equipment payment. A progress payment is preliminary only. By making a <br /> progress payment, the Owner does not waive or release its right, nor is it estopped from <br /> asserting, that previous progress payments were not earned or were in error, whether in <br /> whole or in part. <br /> 1 2. Review Procedures: <br /> a. The Owner's Representative will review the estimate and either indicate in writing to <br /> the Owner his or her concurrence with the estimate and his or her recommendation that <br /> payment be made, or indicate in writing to the Contractor his or her reasons for not <br /> concurring with the estimate. If the Owner's Representative recommends payment and <br /> the Owner concurs, the Owner will pay the Contractor a progress payment on the basis <br /> of the approved partial payment estimate, less retainage and any amounts the Owner <br /> may withhold pursuant to Contract or law. The recommendation of the Owner's <br /> Representative is not conclusive,final or binding upon the Owner. <br /> b. In the event the Owner's Representative does not concur with the estimate, the <br /> Contractor may make the changes necessary to obtain the Owner's Representative's <br /> concurrence and resubmit the partial payment estimate, or submit the original progress <br /> payment estimate directly ry to the Owner, indicating in writing its reasons for refusing to <br /> I make the changes necessato obtain concurrence. <br /> 3. Retained Percentage <br /> a. As provided in Retainage,the Owner will retain five percent of all progress payments. <br /> ' 4. Withholding <br /> a. The Owner's Representative may refuse to recommend the whole or any part of any <br /> payment if in the Owner's Representative's opinion it would be incorrect to make such <br /> ' recommendation to the Owner. The Owner's Representative may also refuse to <br /> recommend any such payment, or because of subsequently discovered evidence or the <br /> result of tests,may nullify any such payment previously recommended to such extent as <br /> may be necessary in the Owner's Representative's opinion to protect the Owner from <br /> loss as a result of: <br /> 1) Defective or damaged Work. <br /> 2) A deductive Change Order. <br /> ' 3) Persistent failure of the Contractor to perform the Work in accordance with the <br /> Contract Documents, including failure to maintain the progress of the Work in <br /> accordance with the construction schedule. Persistent failure to maintain the <br /> progress of the Work shall mean that for a period of two consecutive months <br /> following a written notice from the Owner's Representative or Owner, the <br /> Contractor fails to correct a behind-schedule condition at a rate that would <br /> reasonably indicate that he or she will finish the Project on schedule. <br /> 4) Disregard of authority of the Owner or Owner's Representative or the laws of <br /> any public body having jurisdiction. <br /> 5) Liquidated damages. <br /> 6) Misrepresentation of the quality of materials installed or amount of Work <br /> performed. <br /> 7) Discovery that a previous pay estimate erred with respect to the amount of Work <br /> ' performed or materials installed, irrespective of the Owner's Representative's <br /> recommendation at the time of the progress pay estimate. <br /> b. The Owner may refuse to make payment of the full amount recommended by the <br /> Owner's Representative because of Contract Claims made against the Owner on <br /> account of Contractor's performance or furnishing the Work or because of liens filed in <br /> connection with the Work or other set offs entitling Owner to reduce the amount <br /> ' PROCESS WATER PUMP STATION 06/13/2017 <br /> WO-3647 00 72 13 - 39 <br />