My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Representative to have access to those records and any other records as may be required by the <br /> Owner's Representative to determine the facts or contentions involved in the Contract Claim. <br /> Owner is not obligated to respond to a Contract Claim unless the Contractor is in full compliance <br /> with all the provisions of the General Conditions and the formal Contract Claim document has <br /> been submitted. <br /> C. Full compliance by the Contractor with the provisions of this section is a contractual condition <br /> ' precedent to the Contractor's right to sue or seek any recovery against the Owner in any legal <br /> proceeding. <br /> 12.2 Contents <br /> ' A. All Contract Claims filed by the Contractor shall be in writing, verified under penalty of perjury <br /> by an officer or principal of the Contractor, and in sufficient detail to enable the Owner's <br /> Representative to ascertain the basis and amount of the Contract Claim. All Contract Claims <br /> shall be submitted to the Owner's Representative. At a minimum, each Contract Claim must <br /> include: <br /> ' <br /> I. A detailed factual statement of the Contract Claim for additional compensation and <br /> extension of Contract Time, if any, providing all necessary dates, locations, and items of <br /> work affected by the Contract Claim. <br /> ' 2. The dates of all facts related to the Contract Claim. <br /> 3. The name of each Owner's individual, official, or employee involved in or knowledgeable <br /> about the Contract Claim. <br /> ' 4. The specific provisions of the Contract that support the Contract Claim and a statement of <br /> the reasons why such provisions support the Contract Claim. <br /> ' 5. If the Contract Claim relates to a decision of the Owner's Representative that the Contract <br /> leaves to the Owner's Representative's discretion or as to which the Contract provides that <br /> the Owner Representative's decision is fmal, the Contractor shall set out in detail all facts <br /> supporting its position relating to the decision of the Owner's Representative. <br /> 6. Identification of any documents and the substance of any oral communications that support <br /> the Contract Claim. <br /> ' 7. Copies of any identified documents that support the Contract Claim, other than Owner <br /> documents and documents previously furnished to the Owner by the Contractor. Standard <br /> industry manuals may be incorporated by reference. <br /> t 8. If Contractor seeks an extension of Contract Time: <br /> a. The specific amount of time(including days and dates) sought. <br /> b. The specific reasons the Contractor believes an extension of Contract Time should be <br /> ' granted, including, but not limited to, compliance with the requirements of 5.2.C. <br /> Extensions of Contract Time;and <br /> c. The specific provisions of the Contract Documents under which it is sought. <br /> ' 9. If additional compensation is sought, the exact amount sought and a breakdown of that <br /> amount into the following categories: <br /> a. Labor <br /> b. Materials <br /> c. Direct Equipment. The actual cost for each piece of equipment for which a Contract <br /> Claim is made or in the absence of actual cost, the rates established by the <br /> AGC/WSDOT Equipment Rental Agreement that was in effect when the work was <br /> ' PROCESS WATER PUMP STATION 06/13/2017 <br /> WO-3647 00 72 13 - 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.