My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> performed. In no case shall the amounts sought or paid for each piece of equipment <br /> exceed the rates established by the Equipment Rental Agreement even if the actual cost <br /> for such equipment is higher. The Owner may audit the Contractor's cost records to <br /> determine actual equipment cost. The following information shall be provided for each <br /> piece of equipment: <br /> 1) Detailed description (e.g., Motor Grader Diesel Powered Caterpillar 12 "G", <br /> Tractor Crawler ROPS&Dozer Included Diesel) <br /> 2) The hours of use or standby; and <br /> 3) The specific day and dates of use or standby; <br /> 4) Job Overhead. <br /> 5) Overhead(general and administrative). <br /> 6) Subcontractor's contract claims (in the same level of detail as specified herein is <br /> required for all Subcontractor's contract claims); and <br /> 7) Other categories as specified by the Contractor or the Owner. <br /> 10. A notarized statement shall be submitted to the Owner's Representative containing the <br /> following language: <br /> Under the penalty of law for perjury or falsification, the undersigned, <br /> (name) (title) <br /> of <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and extension of Contract <br /> Time, if any, made herein for Work on this Contract is a true and complete statement of <br /> the factual basis of the Contract Claim and all actual costs incurred and time sought, and <br /> is fully documented and supported under the Contract between the parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> My Commission Expires: <br /> 12.3 False Or Omitted Information <br /> A. General ' <br /> 1. The Contractor waives each Contract Claim for which it presents material information that it <br /> knows, or in the exercise of reasonable care should know, is false, or omits or fails to disclose <br /> material information relating to such Contract Claim. In such case, Contractor shall reimburse <br /> the Owner for any and all fees and expenses incurred in investigating any such Contract Claim. <br /> 12.4 Remedies <br /> A. General <br /> 1. If a Contract Claim has merit in whole or in part, then Contractor's sole remedies shall be <br /> those provided in this subsection. <br /> a. Contractor must timely and strictly comply with the requirements of ARTICLE 10. <br /> NOTICE TO OWNER, ARTICLE 12. CONTRACT CLAIMS and all other <br /> General Conditions relating to the Contract Claim. <br /> b. Adjustments to Contract Time shall be determined pursuant to 5.2.C. Extensions of <br /> Contract Time. <br /> PROCESS WATER PUMP STATION 06/13/2017 <br /> WO-3647 00 72 13 - 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.