1 <br /> ' 2.4 Submittals <br /> A. Where required by the Contract Documents, the Contractor shall submit information which will <br /> enable the Owner's Representative to advise the Owner whether the Contractor's proposed <br /> ' materials,Equipment or methods of work are in general conformance to the design concept and in <br /> compliance with the Drawings and Specifications, such as catalog cuts and shop, working or <br /> detail drawings. In its Submittals, the Contractor shall expressly and explicitly notify the <br /> ' Owner's Representative of any and all deviations from the Specifications. Without express and <br /> explicit Notice of a deviation from the Contract requirements, approval of a Submittal does not <br /> relieve Contractor from complying with Contract requirements. The Owner's approval of a <br /> Submittal did not constitute a waiver of the Contract requirements. The Owner or Owner's <br /> Representative shall respond to a Submittal within 30 days of receipt. The Owner or Owner's <br /> Representative may extend this time for good cause by notifying the Contractor. The Owner will <br /> not be obligated to accept or pay for Work performed by the Contractor that may be affected by <br /> ' materials, Equipment, or methods of work not submitted in a timely manner so that final review <br /> can be accomplished before the affected Work is complete. The Owner shall not be responsible <br /> for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part by <br /> ' Contractor's failure to submit required information in sufficient time for review, comment, and <br /> correction. Contractor's failure to submit required information in sufficient time for review, <br /> comment and correction shall be deemed a waiver of any and all Contract Claims for adjustment <br /> of Contract Sum or Contract Time arising out of, or related to, such a Submittal. Contractor <br /> acknowledges and agrees that it may not rely upon receiving the Owner's response to a Submittal <br /> in less than 30 days, unless the Owner explicitly changes this section by a signed Change Order. <br /> Requests for information or clarification from the Contractor to the Owner shall be treated as a <br /> Submittal. <br /> 2.5 Contractor's Copies of Contract Documents <br /> A. The Contractor shall keep at the construction site at least one set of Contract Documents and one <br /> set of full-size Drawings that shall be available to the Owner's Representative and Owner. <br /> ARTICLE 3 OWNER <br /> 3.1 General <br /> A. The Owner, and the Owner's Representative, shall have the authority to act as the sole judge of <br /> the Work, Equipment and materials with respect to both quantity and quality as set forth in the <br /> Contract. It is expressly stipulated that the Drawings, Specifications and other Contract <br /> ' Documents set forth the requirements as to the nature of the completed Work and do not purport <br /> to control the method of performing Work except in those instances where the nature of the <br /> completed Work is dependent on the method of performance. <br /> B. The Owner has the authority to act, do, perform, and make any all decisions and actions <br /> authorized by the Contract Documents, including, but not limited to, Change Orders, progress <br /> payments, Contract decisions, acceptability of the Contractor's Work, and early possession. The <br /> ' Owner has the authority to accept or reject requests for progress payments that have been <br /> submitted by the Contractor and recommended by the Owner's Representative. The Owner has <br /> the authority to make determinations of the acceptability of the Work. The Owner also has the <br /> ' authority to accept or reject the Owner's Representative's recommendations regarding retention of <br /> defective Work. <br /> ' PROCESS WATER PUMP STATION 06/13/2017 <br /> WO-3647 00 72 13 - 13 <br /> 1 <br />