My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 7/18/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
HDR Engineering Inc 7/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 9:35:24 AM
Creation date
8/2/2018 9:35:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
7/18/2018
End Date
9/28/2018
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Engineering Evaluation & Review
Tracking Number
0001336
Total Compensation
$35,360.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Policy Number. TB2-641-444950-038 <br /> THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br /> DESIGNATED CONSTRUCTION PROJECT(S) <br /> GENERAL AGGREGATE LIMIT <br /> This endorsement modifies insurance provided under the following: <br /> COMMERCIAL GENERAL LIABILITY COVERAGE PART <br /> SCHEDULE <br /> Designated Construction Project(s): <br /> All construction projects not located at premises owned, leased or rented by a Named Insured <br /> Information required to complete this Schedule, if not shown above, will be shown in the Declarations. <br /> A. For all sums which the insured becomes legally 3. Any payments made under Coverage A for <br /> obligated to pay as damages caused by 'occur- damages or under Coverage C for medical <br /> rences" under Section I — Coverage A, and for all expenses shall reduce the Designated Con- <br /> medical expenses caused by accidents under struction Project General Aggregate Limit for <br /> Section I — Coverage C, which can be attributed that designated construction project. Such <br /> only to ongoing operations at a single designated payments shall not reduce the General Ag- <br /> construction project shown in the Schedule gregate Limit shown in the Declarations nor <br /> above: shall they reduce any other Designated Con- <br /> 1. A separate Designated Construction Project struction Project General Aggregate Limit for <br /> General Aggregate Limit applies to each des- any other designated construction project <br /> ignated construction project, and that limit is shown in the Schedule above. <br /> equal to the amount of the General Aggregate 4. The limits shown in the Declarations for Each <br /> Limit shown in the Declarations. Occurrence, Damage To Premises Rented To <br /> 2. The Designated Construction Project General You and Medical Expense continue to apply. <br /> Aggregate Limit is the most we will pay for the However, instead of being subject to the <br /> sum of all damages under Coverage A, ex- General Aggregate Limit shown in the Decla- <br /> cept damages because of "bodily injury" or rations, such limits will be subject to the appli <br /> "property damage" included in the "products- cable Designated Construction Project Gen <br /> completed operations hazard", and for medi— <br /> cal expenses under Coverage C regardless of <br /> the number of: <br /> a. Insureds; <br /> b. Claims made or"suits"brought; or <br /> c. Persons or organizations making claims or <br /> bringing"suits". <br /> CG 25 03 05 09 ©Insurance Services Office, Inc., 2008 Page 1 of 2 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.