My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 7/18/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
HDR Engineering Inc 7/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 9:35:24 AM
Creation date
8/2/2018 9:35:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
7/18/2018
End Date
9/28/2018
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Engineering Evaluation & Review
Tracking Number
0001336
Total Compensation
$35,360.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally C. When coverage for liability arising out of the <br /> obligated to pay as damages caused by "occur- "products-completed operations hazard" is pro- <br /> rences" under Section I — Coverage A, and for all vided, any payments for damages because of <br /> medical expenses caused by accidents under "bodily injury" or "property damage" included in <br /> Section I — Coverage C, which cannot be at- the "products-completed operations hazard" will <br /> tributed only to ongoing operations at a single reduce the Products-completed Operations Ag- <br /> designated construction project shown in the gregate Limit, and not reduce the General Ag- <br /> Schedule above: gregate Limit nor the Designated Construction <br /> 1. Any payments made under Coverage A for Project General Aggregate Limit. <br /> damages or under Coverage C for medical D. If the applicable designated construction project <br /> expenses shall reduce the amount available has been abandoned, delayed, or abandoned <br /> under the General Aggregate Limit or the and then restarted, or if the authorized contract- <br /> Products-completed Operations Aggregate ing parties deviate from plans, blueprints, de- <br /> Limit,whichever is applicable; and signs, specifications or timetables, the project will <br /> 2. Such payments shall not reduce any Desig- be deemed to be the same construction pro- <br /> nated Construction Project General Aggre- ject. <br /> gate Limit. E. The provisions of Section III — Limits Of Insur- <br /> ance not otherwise modified by this endorsement <br /> shall continue to apply as stipulated. <br /> Page 2 of 2 ©Insurance Services Office, Inc., 2008 CG 25 03 05 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.