Laserfiche WebLink
BIDDER: Interwest Construction, Inc. <br /> SCHEDULE A <br /> ITEM NO. PLAN ITEM DESCRIPTION UNIT PRICE TOTAL AMOUNT <br /> A-1 1 LS SURVEYING <br /> 8,000.00 8,000.00 <br /> A-2 240 HR TRAFFIC CONTROL LABOR 66.00 15,840.00 <br /> A-3 1 LS MAINTENANCE AND PROTECTION OF <br /> TRAFFIC CONTROL 8,000.00 8,000.00 <br /> A-4 1 LS TRENCH EXCAVATION SAFETY SYSTEMS <br /> 10,000.00 10,000.00 <br /> A-> 30 HR STREET CLEANING AND SWEEPING 180.00 5,400.00 <br /> A-6 2,038 LF SAWCUT EXISTING IMPROVEMENTS <br /> 4.00 8,152.00 <br /> A-7 190 TON CRUSHED SURFACING TOP COURSE <br /> 90.00 17,100.00 <br /> A-8 1,168 TON CRUSHED SURFACING BASE COURSE <br /> 30.00 35,040.00 <br /> A-9 2,557 TON GRAVEL BORROW <br /> 10.00 25,570.00 <br /> A-10 100 TON FOUNDATION MATERIAL,CLASS A OR B <br /> 72.00 7,200.00 <br /> A-11 I LS TEMPORARY ROADWAY PATCH <br /> 11,000.00 11,000.00 <br /> A-12 640 LF COMBINED SEWER PIPE,30-INCH DIA 350.00 224,000.00 <br /> A-13 2 EA COMBINED SEWER MANHOLE,TYPE 1,60- <br /> INCH d hi'a - (� <br /> A 14 4 COMBINED SEWER MANHOLE,TYPE 1�e l <br /> INCH <br /> A-15 LF COMBINED SEWER MANHOLE, 3 W m( t <br /> z - e 2_—/g <br /> �- <br /> • <br /> ADDITIONAL HEIGHT,TYPE 1,60-INC <br /> A-16 25 LF COMBINED SEWER MANHOLE, <br /> ADDITIONAL HEIGHT,TYPE 3,60-INC <br /> A-17 173 LF STROM DRAIN PIPE, 8-INCH DIA <br /> A-18 206 LF STROM DRAIN PIPE, 12-INCH DIA <br /> A-19 3 EA INLET <br /> A-20 2 EA CATCH BASIN,TYPE 1 <br /> Wetmore Ave Stormwater Division P - Proposal July, 2018 <br /> Bypass Project SP- P - 2 Addendum 1 <br />