Laserfiche WebLink
Interwest Construction, Inc. <br /> SCHEDULE A(Continued) <br /> A-21 7 EA CATCH BASIN,TYPE IL 1,950.00 13,650.00 <br /> A-22 2 EA CATCH BASIN,TYPE 2,48-INCH DIA <br /> 3,100.00 6,200.00 <br /> HMA,CL 1/2"PG 64-22 FOR PERMANENT <br /> A-23 168 TON TRENCH PATCH 200.00 33,600.00 <br /> A-24 28 SY TEMPORARY ASPHALT SIDEWALK AND <br /> CURB 55.00 1,540.00 <br /> A-25 21 SY CONCRETE SIDEWALK <br /> 160.00 3,360.00 <br /> A-26 38 SY CONCREIL DRIVEWAY <br /> 145.00 5,510.00 <br /> A-27 250 LF CONCRETE CURB,TYPE E-1 48.00 12,000.00 <br /> A-28 305 LF CONCRETE CURB AND GUTTER,TYPE A-1 46.00 14,030.00 <br /> A-29 143 SY TOPSOIL AND SEEDING <br /> 30.00 4,290.00, <br /> A-30 1 FA FORCE ACCOUNT $ 30,000 $ 30,000 <br /> A-31 1 LS MOBILIZATION <br /> I 73,245.00_ 73,245.00 <br /> TOTAL BID $ <br /> 681,696.00 <br /> Wetmore Ave Stormwater Division P— Proposal July, 2018 <br /> Bypass Project SP- P - 3 Addendum 1 <br />