CITY OF EVERETT SPECIAL PROVISIONS <br /> included is cost associated with preparation and distribution of public notices involving <br /> parking, street access or traffic issues. <br /> Bid Item A-4 & B-4 &C-4: Trench Excavation Safety Systems <br /> Measurement and Payment: Lump Sum <br /> Measurement for trench excavation safety systems shall be the ratio of pipe installed and <br /> backfilled to the total quantity of pipe listed on the Proposal. <br /> The lump sum bid item includes the costs directly allocated to the safety system for trenches <br /> and all other excavations including, but not limited to, shoring, benching, bracing, excavation, <br /> sheeting, and trench box. This Work shall be accomplished in accordance with Divisions 1, <br /> 2, 7, and 8 of the Standard Specifications and Special Provisions. Payment per lump sum <br /> includes all equipment, materials, labor, installation, and removal, and all other work required <br /> to meet the trench excavation and safety system requirements. <br /> Bid Item A-5 & B-S &C-5: Street Cleaning and Sweeping <br /> Measurement and Payment: Unit Price per Hour <br /> The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all <br /> labor, tools, incidentals, and equipment necessary to provide the street sweeping, cleaning, <br /> and dust control water required for this project. <br /> Measurement for street sweeping and cleaning will be by the hour for the actual time <br /> consumed in pavement sweeping, cleaning and debris removal. No allowance will be made <br /> for time consumed in making repairs to the equipment or for moving the equipment to or from <br /> the site on which the street cleaning is ordered. No separate payment will be made for water <br /> required for dust control and the normal operation of the pickup sweepers. <br /> Bid Item A-6 & B-6 &C-6: Sawcut Existing Improvements <br /> Measurement and Payment: Unit Price per Linear Foot <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the saw-cutting of asphalt or concrete materials, or a <br /> combination of asphalt and concrete, regardless of depth or location of either material, shall <br /> be full compensation for all labor, material, tools, and equipment necessary to satisfactorily <br /> complete the Work as specified in Section 2-02.3(3) of the Standard Specifications, these <br /> Special Provisions and as shown on the Plans. The unit price per lineal foot for saw-cutting <br /> includes, but is not limited to, the saw-cutting necessary for the final joint between existing <br /> pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. Any necessary re-cutting due to <br /> damage during excavation will not be remeasured for payment. Removal of existing asphalt <br /> and concrete materials is considered incidental to this item. <br /> Bid Item A-7 & B-7 &C-7: Crushed Surfacing Top Course <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for crushed surfacing top course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br /> defined in the Work, descriptions for other bid items, shown on the Plans, details or COE <br /> Standard Drawings or as otherwise approved by the Engineer. Crushed Surfacing Top <br /> Wetmore Ave Stormwater Division B—BID ITEM DESCRIPTIONS July, 2018 <br /> Bypass Project SP-B-2 Addendum 1 <br />