My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Course material placed exceeding "neatline" quantities without advance authorization by the <br /> Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br /> equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br /> surfacing top course for the Work as required, from a Contractor supplied source in <br /> accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing top course also includes all costs for controlling moisture <br /> content. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing <br /> soils to attain proper elevations, compaction of native subgrade soils, as well as to uniformly <br /> spread and compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br /> crushed surfacing and while spreading and compacting the material. <br /> Payment for crushed surfacing top course will be by the ton of material placed and approved <br /> by the Inspector. <br /> Bid Item A-8 & B-8 &C-8: Crushed Surfacing Base Course <br /> Measurement and Payment: Unit Price per Ton <br /> Measurement for crushed surfacing base course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br /> defined in the Work, descriptions for other bid items, shown on the Plans, details or COE <br /> Standard Drawings or as otherwise approved by the Engineer. In addition to surfacing, this <br /> product will be paid by the ton for pipe bedding. Crushed Surfacing Base Course material <br /> placed exceeding "neatline" quantities without advance authorization by the Inspector will not <br /> be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br /> equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br /> surfacing base course for the Work as required, from a Contractor supplied source in <br /> accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing base course also includes all costs for controlling <br /> moisture content and all costs for dewatering. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing <br /> soils to attain proper elevations, compaction of native subgrade soils, as well as to uniformly <br /> spread and compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br /> crushed surfacing and while spreading and compacting the material. <br /> Payment for crushed surfacing base course will be by the ton of material placed and <br /> approved by the Inspector. <br /> Bid Item A-9 & B-9 &C-9: Gravel Borrow <br /> Measurement and Payment: Unit Price per Ton <br /> Wetmore Ave Stormwater Division B—BID ITEM DESCRIPTIONS July, 2018 <br /> Bypass Project SP-B-3 Addendum 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.