My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item A-26: Concrete Driveway <br /> Measurement and Payment: Unit Price per Square Yard. <br /> Measurement shall be per square yard as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per square yard for restoration of existing concrete driveways shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the Work <br /> in accordance with the Plans, COE Standard Drawings, Standard Specifications, and these <br /> Special Provisions. Removal of existing driveway, and crushed surfacing top course placed <br /> under driveway is incidental to the concrete driveway item. <br /> Bid Item A-27 & B15: Concrete Curb, Type E-1 <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for construction of concrete curbs shall be full compensation for <br /> all materials, tools, labor and equipment necessary to construct new curb in place in <br /> accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br /> Special Provisions. Removal of existing curb and crushed surfacing top course placed under <br /> curb is incidental to the curb item. <br /> Bid Item A-28: Concrete Curb and Gutter, Type A-1 <br /> Measurement and Payment: Unit Price per Linear Foot. <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> The unit price per linear foot for construction of concrete curb and gutter shall be full <br /> compensation for all materials, tools, labor and equipment necessary to construct new curb <br /> and gutter in place in accordance with the Plans, COE Standard Drawings, Standard <br /> Specifications and these Special Provisions. Removal of existing curb and gutter, and <br /> crushed surfacing top course placed under curb and gutter is incidental to the curb item. <br /> Bid Item A-29: Topsoil, Type A and Seeding <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for providing 4-inch thick Topsoil, Type A shall be limited to dimensions and <br /> work limits defined in the work descriptions for other bid items, shown on the Plans, details <br /> or COE Standard Drawings or as otherwise approved by the Engineer. <br /> The unit price per square yard for Topsoil, Type A & Seeding shall be full compensation for <br /> all labor, compaction, material, tools, and equipment necessary to provide compacted 4 <br /> inches thick imported Topsoil, Type A for the Work as required, from a Contractor-supplied <br /> source in accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for Topsoil, Type A&Seeding includes all costs for hauling, stockpiling, placing, <br /> grading, compacting, seeding, and controlling moisture content. <br /> Also to be included in this bid item shall be the cost of all subgrade preparation and grader <br /> work, or any other equipment required to establish correct surfaces to proper grade before <br /> the topsoil is placed, as well as all equipment required to spread and compact the topsoil <br /> Wetmore Ave Stormwater Division B—BID ITEM DESCRIPTIONS July, 2018 <br /> Bypass Project SP-B -9 Addendum 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.