Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement and payment shall be per each catch basin inlet installed as measured upon <br /> completion. <br /> Bid Item A-23 & B13 & C16: HMA, CL 1/2" PG 64-22 for Permanent Trench Patch <br /> Measurement and Payment: Unit Price per Ton <br /> Measurement for HMA, CL 1/2" PG 64-22 shall be by the ton, recorded on certified weight <br /> tickets in accordance with 1-09.2 WEIGHING EQUIPMENT for HMA placed within the limits <br /> of dimensions defined in the Work or shown on the Plans, Standard Specifications, Standard <br /> Drawings, or as otherwise approved by the Engineer. No deduction will be made for the <br /> weight of asphalt binder, blending sand, mineral filler, or other component of the mixture. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, and perform density tests on multiple lifts of <br /> HMA— CL 1/2" PG 64-22 pavement in trench patches Crushed surfacing will be measured <br /> and paid separately. <br /> Furnishing and applying tack coat, prime coat, joint seal and crack sealing asphalt is to be <br /> included in this bid item with no direct compensation made. All costs for "Anti Stripping <br /> Additive" and "Compaction Adjustment" shall be included in the unit contract price per ton of <br /> the HMA with no direct compensation made. <br /> Bid Item A-24: Temporary Asphalt Sidewalk and Curb <br /> Measurement and Payment: Unit Price per Square Yard <br /> Measurement for Temporary Asphalt Sidewalk and Curb shall be by the square yard, as <br /> delineated by the contractor and approved by the Inspector. Measurement shall be as <br /> directed by the Inspector, in accordance with the Standard Specifications and Section 5-04 <br /> of these Special Provisions. A typical detail for temporary Asphalt Sidewalk and Curb is <br /> attached to this spec package. <br /> The unit price for this bid item shall include all labor, materials, equipment and related work <br /> necessary to furnish, machine-place, compact, roll and perform any hand work necessary <br /> to meet contract requirements. <br /> All costs for"Anti Stripping Additive" and "Compaction Adjustment" shall be included in the <br /> unit contract price per ton of the HMA with no direct compensation made. <br /> Bid Item A-25 & B-14: Concrete Sidewalk <br /> Measurement and Payment: Unit Price per Square Yard. <br /> Measurement shall be per square yard as delineated by the Contractor and approved by the <br /> Inspector prior to removal of existing sidewalk. <br /> The unit price per square yard for concrete sidewalks shall be full compensation for all <br /> materials, tools, labor and equipment necessary to complete the work in accordance with the <br /> Plans, COE Standard Drawings, Standard Specifications and these Special Provisions. <br /> Raising the sidewalk as indicated on the plans is incidental to the concrete sidewalk item. <br /> Removal of existing sidewalk and crushed surfacing top course placed under sidewalk is <br /> incidental to the concrete sidewalk item. <br /> Wetmore Ave Stormwater Division B—BID ITEM DESCRIPTIONS July, 2018 <br /> Bypass Project SP-B-8 Addendum 1 <br />