My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The City will not open or consider any Proposal or any supplement to a Proposal that is <br /> received after the time specified for receipt of Proposals, or received in a location other <br /> than that specified for receipt of Proposals. <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> Delete 1-02.10 and substitute with the following: <br /> After submitting a physical Bid Proposal to the City, the Bidder may withdraw, revise, or <br /> supplement it if: <br /> 1. The Bidder submits a written request signed by an authorized person, and <br /> 2. The City receives the request before the time set for receipt of Proposals. <br /> The original physical Bid Proposal may be supplemented, or revised and resubmitted as <br /> the official Bid Proposal if the City receives it before the time set for receipt of Proposals. <br /> Email, fax or telephone requests to withdraw, revise, or supplement a Proposal are not <br /> acceptable. <br /> Resubmitted Proposals shall be in full compliance with the bidding requirements. Bid <br /> deposit shall be in an amount sufficient for the Proposal as resubmitted. <br /> After the scheduled time for opening Proposals, no Bidder will be permitted to withdraw <br /> his Proposal unless the award of contract is delayed for a period exceeding 45 calendar <br /> days. Proposals received after the scheduled closing for opening Proposals will be <br /> returned unopened to the Bidder. <br /> 1-02.12 Public Opening of Proposals <br /> Supplement 1-02.12 by adding the following: <br /> 1-02.12(1) Postponement of Opening <br /> (******) <br /> The City reserves the right to postpone the date and time for receiving or opening of <br /> Bids, or both, at any time prior to the date and time established in the Notice to Bidders. <br /> Postponement notices shall be provided to Bidders in the form of addenda. <br /> 1-02.13 Irregular Proposals <br /> Revise item 1 of 1-02.13 to read as follows: <br /> 1. A Proposal will be considered irregular and will be rejected if: <br /> a. The Bidder is not prequalified when so required; <br /> b. The authorized proposal form furnished by the City is not used or is altered; <br /> c. The completed proposal form contains any unauthorized additions, deletions, <br /> alternate Bids, or conditions; <br /> d. The Bidder adds provisions reserving the right to reject or accept the Award, <br /> or enter into the Contract; <br /> e. A price per unit cannot be determined from the Bid Proposal; <br /> f. The Proposal form is not properly executed; <br /> g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> applicable, as required in 1-02.6; <br /> h. The Bidder fails to submit or properly complete a Disadvantaged, Minority or <br /> Women's Business Enterprise Certification, as required in 1-02.6; <br /> i. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> the material terms of the Bid invitation; or <br /> j. More than one proposal is submitted for the same project from a Bidder under <br /> the same or different names. <br /> Wetmore Ave Stormwater Bypass Division 1 -GENERAL REQUIREMENTS August, 2018 <br /> WO No-UP3704 SP-1-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.