My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.6(3) Materials and Equipment Furnished by City <br /> (******) <br /> Contractor shall install materials and Equipment furnished by the City as provided in the <br /> technical sections of the Specifications. Furnishing of material and Equipment by the <br /> City will be considered conclusive evidence of their acceptability for the purpose <br /> intended. If the Contractor discovers defects in material or Equipment furnished by the <br /> City, it shall immediately notify the City. After such discovery, the Contractor shall not <br /> proceed with Work involving City-furnished materials and Equipment unless authorized <br /> by the City. Unless otherwise noted or specifically stated, materials and Equipment <br /> furnished by the City, that are not of local occurrence or manufacture, are considered to <br /> be "FOB" railroad station or truck terminal nearest to the site of the Work. At no cost to <br /> the City, the Contractor shall unload, transport, store, and protect such material and <br /> Equipment from damage. The Contractor shall inspect such City-furnished material and <br /> Equipment on receipt and provide the City with written acceptance for the incorporation <br /> of said material and Equipment into the Work. After receipt by the Contractor, the <br /> Contractor bears all risk of loss and casualty to City furnished materials and Equipment. <br /> 1-05.7 Removal of Defective and Unauthorized Work <br /> Supplement 1-05.7 by adding the following: <br /> If the Contractor fails to remedy defective or unauthorized Work within the time specified <br /> in a written notice from the Engineer, or fails to perform Work required by the Contract <br /> Documents, the Engineer may correct and remedy such Work as may be identified in <br /> the written notice, with City forces or by such other means as the City may deem <br /> necessary. <br /> If the Contractor fails to comply with a written order to remedy what the Engineer <br /> determines to be an emergency situation, the Engineer may have the defective and <br /> unauthorized Work corrected immediately, have the rejected Work removed and <br /> replaced, or have Work the Contractor refuses to perform completed by using City or <br /> other forces. An emergency situation is a situation when, in the opinion of the Engineer, <br /> a delay in its remedy could be potentially unsafe, or might cause serious risk of loss or <br /> damage to the public. <br /> Direct or indirect costs incurred by the City attributable to correcting and remedying <br /> defective or unauthorized Work, or Work the Contractor failed or refused to perform, <br /> shall be paid by the Contractor. Payment will be deducted by the Engineer from monies <br /> due, or to become due, the Contractor. Such direct and indirect costs shall include in <br /> particular, but without limitation, compensation for additional professional services <br /> required, and costs for repair and replacement of Work of others destroyed or damaged <br /> by correction, removal, or replacement of the Contractor's unauthorized Work. <br /> In its sole discretion, the City may retain Work that is not in compliance with the Contract. <br /> The City will determine the just and reasonable value for such defective Work and <br /> deductions will be made in the payments due or to become due to the Contractor. Final <br /> Acceptance will not act as a waiver of the City's right to recover from the Contractor an <br /> amount representing the deduction for retention of defective Work. <br /> No adjustment in Contract Time or Contract Sum will be allowed because of the Delay <br /> in the performance of the Work attributable to the exercise of the City's rights provided <br /> by this section. <br /> The rights exercised under the provisions of this section shall not diminish the City's right <br /> to pursue any other avenue for additional remedy or damages with respect to the <br /> Contractor's failure to perform the Work as required. <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.