My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.10 Guarantees <br /> Supplement 1-05.10 by adding the following: <br /> The Contractor further warrants to the City, the Engineer and the City's Representative <br /> that all materials and Equipment furnished under this Contract will be of highest quality <br /> and new unless otherwise specified by the City, free from faults and defects and in <br /> conformance with the Contract Documents. All Work not so conforming to these <br /> standards shall be considered defective. If required by the City's Representative, the <br /> Contractor shall furnish satisfactory evidence as to the kind and quality of materials and <br /> Equipment. <br /> The Work furnished shall be of first quality and the workmanship shall be the best <br /> obtainable in the various trades. The Work shall be of safe, substantial and durable <br /> construction in all respects. For a period of three hundred sixty-five (365) calendar days, <br /> commencing on the date of Final Acceptance, the Contractor shall, upon the receipt of <br /> Notice in writing from the City, promptly make all repairs arising out of defective <br /> materials, workmanship, or Equipment at no cost to the City. The City is hereby <br /> authorized to make such repairs if, fourteen (14) calendar days after giving of such <br /> Notice to the Contractor, the Contractor has failed to make or undertake the repairs with <br /> due diligence. In case of an emergency where, in the opinion of the City, delay could <br /> cause serious loss or damage, repairs may be made prior to or concurrent with Notice <br /> being sent to the Contractor. All expenses in connection with such repairs will be <br /> charged to the Contractor. <br /> "Acceptance of the Work" shall not extinguish any covenant or agreement on the part of <br /> the Contractor to be performed or fulfilled under this Contract that has not, in fact, been <br /> performed or fulfilled at the time of such acceptance. All covenants and agreements <br /> shall continue to be binding on the Contractor until they have been fulfilled. <br /> The City and the Contractor agree that the guarantee on the completed portions of the <br /> Work possessed and used by the City shall commence as to those portions on the date <br /> that the City takes possession of those portions and so notifies the Contractor in writing. <br /> City and Contractor further agree that such taking possession and use shall not be <br /> deemed as acceptance of the Work. Takeover of completed portions of the Work shall <br /> be at the City's option and will not be made until the Work can be put into routine service <br /> on a permanent basis. <br /> The guarantee provided herein shall be in addition to those specific guarantee or <br /> warranty requirements for particular Equipment or Work items, or both, as indicated in <br /> the Specifications and Special Provisions. <br /> 1-05.11 Final Inspection <br /> Delete 1-05.11 and substitute the following: <br /> 1-05.11 Final Inspections and Operational Testing <br /> (******) <br /> 1-05.11(1) Substantial Completion Date <br /> When the Contractor considers the Work to be substantially complete, the Contractor <br /> shall so notify the Engineer and request the Engineer establish the Substantial <br /> Completion Date. The Contractor's request shall list the specific items of Work that <br /> remain to be completed in order to reach physical completion. The Engineer will <br /> schedule an inspection of the Work with the Contractor to determine the status of <br /> completion. The Engineer may also establish the Substantial Completion Date <br /> unilaterally. <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.