My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> by the City, the Contractor shall promptly furnish proof of payment of such accounts <br /> to the City. <br /> 1-05.18(3)D Attention to Work <br /> The Contractor, either in person or acting through its representative, shall give <br /> personal attention to and shall manage the Work so that it shall be prosecuted <br /> faithfully and completed under the Project schedule. When its representative is not <br /> personally present at the Project site, its designated alternate shall be available and <br /> shall have the authority to act in matters relating to this Contract. <br /> Where detailed construction requirements are not set forth in the Standard <br /> Specifications or these Special Provisions, the Contractor shall perform the Work of <br /> a quality comparable to the workmanship specified for other parts of the Work, from <br /> firms having established good reputations for similar Work, or by following industry <br /> standard practices. The Contractor shall perform all Work in compliance with and <br /> conforming to applicable building codes in effect at the time the Work is being <br /> performed. <br /> 1-05.18(3)E Safety <br /> The Contractor alone shall be responsible for safety on the job site, including, but <br /> not limited to, the safety of its and its Subcontractor's employees. The Contractor <br /> shall maintain the Project site and perform the Work in a manner that meets the <br /> City's responsibility under statutory and common law for the provision of a safe <br /> place to work. <br /> 1-05.18(3)F Threats, Intimidation and Harassment Forbidden <br /> Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents to threaten bodily injury or property damage, to <br /> intimidate or attempt to intimidate any person, or to assault or physically harass any <br /> person. Forbidden conduct includes, but is not limited to, threatening, appearing, <br /> or actually doing any of the following: pushing, shoving, striking, physically blocking <br /> a person or a person's vehicle, vandalism, malicious mischief, or any other act that <br /> a reasonable person would understand be intended to intimidate, cause personal <br /> injury, or cause property damage. Contractor shall remove from the job site any <br /> person reasonably under its control or direction who the Contractor or City <br /> reasonably believes violated this section. The lack of a request from the City or <br /> City's Representative to the Contractor to remove someone from the job site does <br /> not relieve the Contractor from its obligation to remove someone. <br /> 1-05.18(3)G Weapons Forbidden <br /> Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents or representatives to carry or possess, openly or <br /> concealed, explosives or weapons on the job site, except: (a) such explosives are <br /> as reasonably required for performance of the Work, such as those necessary for <br /> blasting or demolition work called for by the Contract Documents or (b) <br /> commissioned law enforcement officers or security personnel under authority of <br /> their commission. A weapon is any object, instrument or chemical that is (1) <br /> designed in such a manner to inflict harm or injury to another person; or(2) any item <br /> used in a manner threatening harm or injury to another person. Weapons include, <br /> but are not limited to, firearms, dangerous knives, dangerous chemicals, tear gas, <br /> martial arts weapons, blackjacks or other weapons. Further, weapons should <br /> include those described in EMC Chapter 10.78. Possession of mace, pepper spray <br /> or the like for defensive purposes is not a violation of this policy. Contractor shall <br /> remove from the job site any person reasonably under its control or direction who <br /> the Contractor or City reasonably believes violated this section. The lack of a <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.