My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> request from the City or City's Representative to the Contractor to remove someone <br /> from the job site does not relieve the Contractor from its obligation to remove <br /> someone. <br /> 1-05.18(3)H Safety Standards <br /> The Contractor shall comply with Section 107 of the Contract Work Hours and <br /> Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of <br /> Labor Regulations (29 CFR, Part 5). Under this Section, the Contractor shall not <br /> require any laborer or mechanic to work in surroundings or under working conditions <br /> that are unsanitary, hazardous, or dangerous to its health and safety as determined <br /> under construction, safety, and health standards promulgated by the Secretary of <br /> Labor. These requirements do not apply to the purchase of supplies or materials or <br /> articles ordinarily available on the open market, or contracts for transportation or <br /> transmission of intelligence. <br /> 1-05.18(3)1 Public Safety and Convenience <br /> The Contractor shall conduct its work so as to ensure the least possible obstruction <br /> to traffic and inconvenience to the general public, business, organizations and <br /> residents in the vicinity of the Work and to reasonably protect persons and property. <br /> No roads or street shall be closed to the public except with the permission of the <br /> City's Representative and the proper governmental authority. Fire hydrants on or <br /> adjacent to the Work shall be accessible to firefighting equipment. Temporary <br /> provisions shall be made by the Contractor for the use of sidewalks, private and <br /> public driveways and proper functioning of gutters, sewer inlets, drainage ditches <br /> and culverts, irrigation ditches and natural water courses. <br /> 1-05.19 City-Contractor Coordination <br /> (******) <br /> 1-05.19(1) Suggestions to Contractor <br /> Nothing in these Contract Documents requires the City's Representative to provide the <br /> Contractor with direction or advice on how to do the Work, construction practices, or <br /> means and methods. If the City's Representative approves, suggests or recommends <br /> any construction practice, means, method or manner for doing the Work or producing <br /> materials, the approval or recommendation shall not: (A) guarantee that following the <br /> method or manner will result in compliance with the Contract Documents; (B) relieve the <br /> Contractor of any risks or obligations under the Contract Documents; or (C) create <br /> liability by the City to the Contractor. <br /> Suggestions as to the plans or methods of accomplishing the Work or Contract <br /> requirements by the City or the City's Representative to the Contractor but not specified <br /> or required, if adopted or followed by the Contractor in whole or in part, shall be used at <br /> the risk and responsibility of the Contractor. The City and the City's Representative <br /> assume no responsibility therefore and in no way will be held liable for any defects in <br /> the Work which may result from or be caused by use of such plan or method of Work. <br /> 1-05.19(2) Meetings with City <br /> The Contractor shall have its duly authorized representative attend periodic <br /> informational meetings with the City's Representative and City staff, as reasonably <br /> required by the City. <br /> Contractor, City, and City's Representative shall meet as often as determined by the <br /> City's Representative, but no less often than once each month. The purpose of the <br /> meeting is to review Project status in relation to the construction schedule; review value <br /> of Work completed during the previous month; and, if applicable, review Contractor's <br /> plans to return Project status to that required by the schedule. If requested by the City <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.