My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br /> (PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br /> Regulation I are included in the Appendix D as it relates to fugitive dust control. The <br /> Contractor shall submit a dust control plan including dust control measures for its <br /> activities related to this Contract that may cause dust. This plan shall be submitted <br /> to the Engineer prior to commencing activity at the job site. <br /> 1-07.6 Permits and Licenses <br /> Supplement 1-07.6 by adding the following: <br /> A City of Everett business license is required for the Contractor and the Contractor's <br /> Subcontractors prior to commencing construction on this Contract. <br /> Contractor shall obtain all necessary permits required by law and the City of Everett. <br /> All general building, electrical, plumbing permits will be issued at no cost to the <br /> Contractor. In addition, obtain all required permits for waste disposal sites. Waste <br /> disposal sites shall be in the United States, unless otherwise expressly stated in the <br /> Contract Documents or the City gives prior written approval. <br /> This Project contains less than one acre of total disturbed area within the project <br /> limits and does not require Contractor to apply for Ecology's Construction <br /> Stormwater General Permit. <br /> 1-07.9 Wages <br /> 1-07.9(1) General <br /> Delete the first paragraph of 1-07.9(1) and substitute the following: <br /> This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br /> RCW 48.28, as amended or supplemented. Workers shall receive no less than the <br /> prevailing rate of wage. Bidder shall use the Washington State Prevailing Wage <br /> Rates for Snohomish County, effective at the time of bid opening. Bidder is solely <br /> responsible to use the schedule in effect at the Bid Opening Date, determine the <br /> appropriate labor classification(s), and use the appropriate and correct prevailing <br /> wage and benefit rate(s). The hourly minimum rates for wages and fringe benefits <br /> can be obtained at the following URL: <br /> http://www.Ini.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp <br /> Printed copies of the current prevailing wage rates are available for viewing at City <br /> of Everett Public Works, 3200 Cedar St, Everett, WA and the City will mail a hard <br /> copy of the prevailing wage rates upon written request received within 7 days of the <br /> Bid Opening Date. <br /> Delete the fifth paragraph of 1-07.9(1) and substitute the following: <br /> If employing labor in a class not listed in the L & I prevailing wage rate schedule, <br /> the correct wage and benefits rate for that class and locality from the Industrial <br /> Statistician, Washington State Department of Labor and Industries (State L&I), and <br /> provide a copy of those determinations to the Project Engineer. <br /> 1-07.9(5) Required Documents <br /> Supplement 1-07.9(5) by adding the following: <br /> The Owner may require payroll reports for the Contractor and every Subcontractor <br /> be submitted weekly to the Construction Division, Public Works Service Center, <br /> 3200 Cedar Street, Everett, Washington 98201. The payroll reports shall contain <br /> the following information: <br /> 1. Name and residence address of each worker. <br /> 2. Social Security number of each worker. <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.