Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> actions of any nature for, or on account of the use of any patented devices, materials, or <br /> processes. <br /> 1-07.23 Public Convenience and Safety <br /> Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br /> Nothing contained in this Contract is intended to create any third-party beneficiary rights <br /> in favor of the public or any individual utilizing the facilities being constructed or improved <br /> under this Contract. <br /> 1-07.23(1) Construction Under Traffic <br /> Supplement 1-07.23(1) by adding the following after item 5 in the second paragraph: <br /> If Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> in writing of any change in the closure hours. <br /> No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br /> p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br /> as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> Notify the local Fire, Police and Engineering Departments before the beginning of <br /> each phase of construction so that these agencies may re-route their emergency <br /> vehicles around the construction zone. The non-emergency phone number for <br /> Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public Works <br /> Engineering is 257-8800. <br /> Notify City of Everett Transit at 425-257-7765 and Community Transit at 425-348- <br /> 7100 of all street closures or delays at least five business days in advance to enable <br /> rerouting of buses. <br /> Notify the property owners at least 72 hours in advance to enable them to remove <br /> vehicles parked in the vicinity of Work. Towing vehicles shall be the responsibility of the <br /> Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> (******) <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2) TRAFFIC CONTROL PLANS. <br /> Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. <br /> Notify all affected property owners prior to commencing the barricading of <br /> streets, sidewalks and driveways. <br /> All business driveways shall remain open except as necessary to permit curing <br /> of construction materials or for short periods of time as required for <br /> excavations. However, at least one driveway per business shall remain open <br /> to vehicular traffic at all times unless otherwise approved by the Engineer and <br /> affected property owner in writing. <br /> Signs and barricades shall be supplemented by lanterns or flasher units during <br /> the hours of darkness. <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-85 <br />