My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Drivers of motor vehicles used in connection with the construction shall obey <br /> traffic rules posted for such location in the same manner and under the same <br /> restrictions as provided for the drivers of private vehicles. <br /> Conduct the Work, at all time throughout the project, in such a manner as will <br /> obstruct and inconvenience vehicular and pedestrian traffic as little as possible. <br /> Keep the streets, sidewalks and private driveways open except for the brief <br /> periods when actual Work is being done. <br /> 1-07.24 Rights of Way <br /> Deletel-07.24 and substitute the following: <br /> Street right of way lines, limits of easements, and limits of construction permits are <br /> indicated on the Plans. The Contractor's construction activities shall be confined within <br /> these limits, unless arrangements for use of private property are made. <br /> Generally, the City will have obtained, prior to bid opening, all rights of way and <br /> easements, both permanent and temporary, necessary for carrying out the Work. <br /> Exceptions to this are noted on the Plans. <br /> Whenever any of the Work is accomplished on or through property other than public <br /> right of way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> easement agreement obtained by the City from the owner of the private property. Copies <br /> of the easement agreements may be included in the Contract Documents or made <br /> available to the Contractor as soon as practical after they have been obtained by the <br /> Engineer. <br /> The Contractor shall not proceed with any portion of the Work in areas where right of <br /> way, easements or rights of entry have not been acquired until the Engineer certifies to <br /> the Contractor that the right of way or easement is available or that the right of entry has <br /> been received. If the Contractor is delayed due to acts of omission on the part of the <br /> City in obtaining easements, rights of entry or right of way, the Contractor will be entitled <br /> to an extension of time. The Contractor agrees that Delay resulting from City obtaining <br /> easement or right of entry or right of way shall not be a breach of Contract. <br /> Each property owner shall be given 48 hours notice prior to entry by the Contractor. This <br /> includes entry onto easements and private property where private improvements must <br /> be adjusted. <br /> The Contractor shall be responsible for providing, without expense or liability to the City, <br /> any additional land and access thereto that the Contractor may desire for temporary <br /> construction facilities, storage of materials, or other Contractor needs. However, before <br /> using any private property, whether adjoining the Work or not, the Contractor shall file <br /> with the Engineer a written permission of the private property owner, and, upon vacating <br /> the premises, a written release from the property owner of each property disturbed or <br /> otherwise interfered with by reasons of construction pursued under this Contract. The <br /> statement shall be signed by the private property owner, or proper authority acting for <br /> the owner of the private property affected, stating that permission has been granted to <br /> use the property and all necessary permits have been obtained or, in the case of a <br /> release, that the restoration of the property has been satisfactorily accomplished. The <br /> statement shall include the parcel number, address, and date of signature. Written <br /> releases shall be filed with the Engineer before the Completion Date will be established. <br /> 1-07.27 No Waiver of State's Legal Rights <br /> Delete 1-07.27 and substitute the following: <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.