My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-07.27 No Waiver of City's Legal Rights <br /> (******) <br /> The City shall not be precluded or estopped by any measurement, estimate, or certificate <br /> made either before or after the completion and acceptance of the Work and payment therefor <br /> from showing the true amount and character of the Work performed and materials furnished <br /> by the Contractor, or from showing that any such measurement, estimate, or certificate is <br /> untrue or incorrectly made, or that the Work or materials do not conform in fact to the <br /> Contract. The City shall not be precluded or estopped, notwithstanding any such <br /> measurement, estimate, or certificate, and payment in accordance therewith, from recovering <br /> from the Contractor and the Sureties such damages as it may sustain by reason of the <br /> Contractor's failure to comply with the terms of the Contract. Neither the acceptance by the <br /> Engineer nor any payment for the whole or any part of the Work, nor any extension of time, <br /> nor any possession taken by the City shall operate as a waiver of any portion of the Contract <br /> or of any power herein reserved or any right to damages herein provided, or bar recovery of <br /> any money wrongfully or erroneously paid to the Contractor. A waiver of any breach of the <br /> Contract shall not be held to be a waiver of any other or subsequent breach. <br /> The Contractor and the City recognize that the impact of overcharges to the City by the <br /> Contractor resulting from antitrust law violations by the Contractor's suppliers or <br /> Subcontractors adversely affects the City rather than the Contractor. Therefore, the <br /> Contractor agrees to assign to the City all claims for such overcharges. <br /> 1-08 PROSECUTION AND PROGRESS <br /> Supplement Section 1-08 by adding the following: <br /> 1-08.0 Preliminary Matters <br /> 1-08.0(1) Preconstruction Conference <br /> Prior to the Contractor beginning the Work, a preconstruction conference will be held <br /> between the Contractor, the Engineer and such other interested parties as may be <br /> invited. The purpose of the preconstruction conference will be: <br /> 1. To review the initial progress schedule; <br /> 2. To establish a working understanding among the various parties associated or <br /> affected by the Work; <br /> 3. To establish and review, at a minimum, procedures for progress payment, <br /> notifications, approvals, and submittals; <br /> 4. To establish normal working hours for the Work; <br /> 5. To review safety standards and traffic control; and <br /> 6. To discuss such other related items as may be pertinent to the Work. <br /> The Contractor shall prepare and submit at the preconstruction meeting the following: <br /> 1. A Schedule of Values of all lump sum items; <br /> 2. A preliminary schedule of working drawing submittals; and <br /> 3. A list of material sources for approval if applicable. <br /> 1-08.0(2) Hours of Work <br /> Except in the case of emergency or unless otherwise approved by the City, the normal <br /> straight time working hours for the Contract shall be any consecutive 8-hour period <br /> between 7:00 a.m. and 6:00 p.m. of a working day with a maximum 1-hour lunch break <br /> and a 5-day work week. Should Contractor elect to work on a holiday or weekend, those <br /> normal working hours shall be from 9:00 a.m. to 6:00 p.m. The normal straight time 8- <br /> hour working period for the Contract shall be established at the preconstruction <br /> conference or prior to the Contractor commencing the Work. <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.