My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-08.5(2) Substantial Completion <br /> (******) <br /> When the Contractor considers the Work to be Substantially Complete and ready for its <br /> intended use, it shall give Notice to the City's Representative. The Notice shall include <br /> an itemized list of remaining incomplete Work. If the City's Representative determines <br /> the Work is not substantially complete, it will so notify the Contractor in writing, identifying <br /> the reasons for such a determination. If the City's Representative finds the Work <br /> substantially complete, it will meet with the Contractor to (1) prepare a Punch List of <br /> incomplete items of Work; (2) define the division of responsibility between City and <br /> Contractor with respect to security, operation, maintenance, heat, utilities, insurance, <br /> and warranties; and (3) describe other issues related to acceptance of the substantially <br /> completed Work. <br /> If the City's Representative is not an employee of the City, the City's Representative will <br /> write to the City upon reaching agreement with the Contractor, certifying that the Work <br /> is substantially complete, listing the items of incomplete Work, stating the date for <br /> completion of incomplete work, defining the division of responsibilities, and setting forth <br /> any other terms related to acceptance. In such event, the City will review the City's <br /> Representative's certification that the Work is substantially complete. If the City concurs, <br /> the City will notify the Contractor in writing that the Work is accepted as substantially <br /> complete. Except for any portion(s) of Work specified for early completion or required <br /> by the City for early possession, Substantial Completion will not occur for Work until the <br /> entire Project is ready for possession and use. The acceptance Notice will include a <br /> Punch List of incomplete Work items and corrective Works, set the date for their <br /> completion and repair, describes the division of responsibility between the City and <br /> Contractor, and describe other terms of acceptance. The Contractor will acknowledge <br /> receipt of the acceptance Notice in writing, indicating acceptance of all of its terms and <br /> provisions. <br /> Subsequent to the Substantial Completion date, the City may exclude the Contractor <br /> from the Work during such periods when construction activities might interfere with the <br /> intended operation of the Project. The City, however, shall allow the Contractor <br /> reasonable access for completion or correction of incomplete Punch List items. <br /> 1-08.5(3) Acceptance of Work <br /> (******) <br /> Upon completion of the Project, including, but not limited to, record drawings, as-builts, <br /> required reports and operations and maintenance manuals, the Contractor shall so notify <br /> the City's Representative in writing. Upon receipt of the notification, the City's <br /> Representative will promptly, by personal inspection, determine the actual status of the <br /> Work in accordance with the terms of the Contract. If the City's Representative finds <br /> materials, Equipment, or workmanship that do not meet the terms of the Contract, it will <br /> prepare a Punch List of such items and submit it to the Contractor. Following completion <br /> of the corrective work by the Contractor, the City's Representative will notify the City that <br /> the Work has been completed in accordance with the Contract. The City shall make the <br /> final determination of acceptability and completion. For portions of the Project not <br /> previously accepted as substantially complete, the conditions of guarantee shall <br /> commence on the date that the City determines the Project is complete. <br /> 1-08.6 Suspension of Work <br /> Supplement 1-08.6 by adding the following: <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.