CITY OF EVERETT SPECIAL PROVISIONS <br /> satisfactory and timely performance of the Work shown on the critical path of the <br /> Contractor's approved progress schedule. Other conditions beyond the control of <br /> the Contractor may qualify for an extension of time in accordance with Section 1- <br /> 08.8. <br /> Contract Time shall begin on the effective date of the Notice to Proceed. The <br /> Contract Documents may specify another starting date for Contract Time, in which <br /> case, Contract Time will begin on the starting date the Contract Documents specify. <br /> Each working day shall be charged to the Contract as it occurs, beginning on the <br /> effective date of the Notice to Proceed, unless otherwise provided in the Contract <br /> Documents, until the Contract Work is physically complete. Each week the <br /> Engineer will provide the Contractor a statement that shows the number of working <br /> days: (1) charged to the Contract the week before; (2) specified for the physical <br /> completion of the Contract; and (3) remaining for the physical completion of the <br /> Contract. The statement will also show the nonworking days and partial or whole <br /> day the Engineer declares as unworkable. Within 14 calendar days after the date <br /> of each statement, the Contractor shall file a written protest of any alleged <br /> discrepancies in it. To be considered by the Engineer, the protest shall be in <br /> sufficient detail to enable the Engineer to ascertain the basis and amount of time <br /> disputed. By not filing such detailed protest in that period, the Contractor shall be <br /> deemed as having accepted the statement as correct. If the Contractor elects to <br /> work ten hours a day and four days a week (a 4-10 schedule) and the fifth day of <br /> the week in which a 4-10 shift is worked would ordinarily be charged as a working <br /> day then the fifth day of that week will be charged as a working day whether or not <br /> the Contractor works on that day. <br /> The Engineer will give the Contractor written notice of the Physical Completion Date <br /> for all Work the Contract requires. That date shall constitute the Physical <br /> Completion Date of the Contract, but shall not imply the City's acceptance of the <br /> Work or the Contract. <br /> The Engineer will give the Contractor written notice of the Completion Date of the <br /> Contract after all the Contractor's obligations under the Contract have been <br /> performed by the Contractor. The following events must occur before the <br /> Completion Date can be established: <br /> 1. The physical Work on the project must be complete; and <br /> 2. The Contractor shall furnish all documentation required by the Contract <br /> and required by law, to allow the City to process final acceptance of the <br /> Contract. <br /> The following documents must be received by the Engineer prior to establishing a <br /> Completion Date: <br /> a. Certified payrolls. <br /> b. Material Acceptance Certification Documents. <br /> c. Annual Report of Amounts Paid as MBE/WBE Participants. <br /> d. Final Contractor Voucher Certification. <br /> e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> and all Subcontractors. <br /> Supplement 1-08.5 by adding the following: <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-96 <br />