Laserfiche WebLink
2 . Curbs, gutters, grainage and sidewalk on the west side <br /> of Pine Street between 9th and 10th and a 22 foot asphalt <br /> roadbed along the Pine Street right-of-way between 9th <br /> and 10th. <br /> (Estimated Cost: $54 , 777) <br /> 3 . Repair of Wiggums Hollow Park <br /> (Estimated Cost: $10 , 000) <br /> 4 . Curbs , gutters, drainage and sidewalks on the east and <br /> west sides of the 1300 and 1400 blocks of Maple and an <br /> asphalt overlay of the existing roadbed in the 1300 and <br /> 1400 blocks of Maple. <br /> (Estimated Cost: $72 , 954) <br /> 5 . Sidewalk on the west side of Walnut from 9th to Butler <br /> (Estimated Cost: $4 , 108) <br /> 6 . Sidewalk on the NW 140 feet of 17th Street between Cedar <br /> and Pine. <br /> (Estimated Cost: $2 , 000) <br /> D. Lowell Neighborhood Improvements - (as amended by Lowell resi- <br /> dents December 19 , 1979) : <br /> 1. Planning Study of Lowell <br /> (Estimated Cost: $20, 000) <br /> 2 . One Tennis Court at Lowell Park <br /> (Estimated Cost: $25 , 000) <br /> 3 . Unbreakable covers for lights in Lowell Park and more <br /> lighting <br /> (Estimated Cost: $3 , 000) <br /> 4 . Unenclosed shelter with electrical outlets in Lowell <br /> Park <br /> (Estimated Cost: $40 , 000) <br /> 5. Completion or walkway from Broadway to I-5 overpass on <br /> Lowell Road <br /> (Estimated Cost: $7 , 625) <br /> 6 . Assistance to Lowell, through the Council for a Greater <br /> Everett, with its neighborhood meetings, notices, and <br /> citizen participation, up to a maximum of $875 . <br /> 7 . Guardrail along walkway on Lowell Road, west of 4th <br /> Avenue. <br /> (Estimated Cost: $500) • <br /> 8 . Lowell Cleanup <br /> (Estimated Cost: $500) <br /> Section 9 : <br /> A. The sum of $424 , 000 is hereby appropriated to fund No. 333 , <br /> "1979 Block Grant Neighborhood Improvements" , as follows : <br /> 1 . Program 739 , Riverside Neighborhood $ 74 , 000 <br /> Improvements <br /> 2 . Program 740 , Port Gardner Neighborhood 80 , 900 <br /> Street and Sidewalk Improvements <br /> (3) <br />