My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 738-80
>
Ordinances
>
Ordinance 738-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2018 9:57:31 AM
Creation date
8/24/2018 9:57:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
738-80
Date
10/29/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 . Completion of Item #6 above , if not completed with <br /> budgeted $25 , 000. <br /> 10 . Sidewalk reconstruction on Gedney and Wall in the <br /> following priority: <br /> a. Sidewalk reconstruction on west side of Gedney <br /> (Estimated Cost: $1 , 350) <br /> b. Sidewalk reconstruction on Wall from Nassau to <br /> Bond <br /> (Estimated Cost: $1, 740) <br /> C. Northeast Everett Neighborhood Improvements: <br /> 1. Curbs , gutters and drainage on NW 140 feet on 17th <br /> Street between Cedar and Pine. <br /> (Estimated Cost: $3 , 213) <br /> 2 . Curbs, gutters drainage and sidewalk on the west side <br /> of Pine Street between 9th and 10th and a 22 foot <br /> asphalt roadbed along the Pine Street right-of-way <br /> between 9th and 10th. <br /> (Estimated Cost: $54 , 777) <br /> 3. Repair of Wiggums Hollow Park <br /> (Estimated Cost: $10 , 000) <br /> 4 . Curbs , gutters, drainage and sidewalks on the east and <br /> west sides of the 1300 and 1400 blocks of Maple and an <br /> asphalt overlay of the existing roadbed in the 1300 <br /> and 1400 blocks of Maple. <br /> (Estimated Cost: $72 , 954) <br /> 5 . Sidewalk on the west side of Walnut from 9th to Butler <br /> (Estimated Cost: $4 , 108) <br /> 6 . Sidewalk on the NW 140 feet of 17th Street between <br /> Cedar and Pine <br /> (Estimated Cost: $2 , 000) <br /> D. Lowell Neighborhood Improvements - (as amended by Lowell resi- <br /> dents October 16 , 1980) : <br /> 1. Planning Study of Lowell <br /> (Estimated Cost: $20 , 000) <br /> 2 . Lowell Land Acquisition and Park Improvements <br /> (Estimated Cost: $25 , 000) <br /> 3 . Unbreakable covers for lights in Lowell Park and more <br /> lighting <br /> (Estimated Cost: $3 , 000) <br /> 4 . Unenclosed shelter with electrical outlets in Lowell <br /> Park <br /> (Estimated Cost: $40, 000) <br /> 5 . Completion of walkway from Broadway to I-5 overpass on <br /> Lowell Road <br /> (Estimated Cost: $7 , 625) <br /> (6) <br />
The URL can be used to link to this page
Your browser does not support the video tag.